Description: LITTLE CITIZENS PRESCHOOL is a CHILD CARE CENTER in PHOENIX AZ, with a maximum capacity of 52 children. This child care center helps with children in the age range of Infant; Ones; Twos; School-Age. The provider does not participate in a subsidized child care program.
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable, but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns, as the provider may have already addressed some or all issues. Reports can also be verified with your local daycare licensing office.
Survey Date | Date Corrected | Rule/Statute | Title |
---|---|---|---|
2021-11-12 | 2021-12-28 | Article 2 | R9-5-203.C. |
Findings: Based on facility documentation and the Surveyor's observations, the file for Staff #2 lacked a copy of their fingerprint clearance card. | |||
2021-11-12 | 2021-12-28 | article 4 | R9-5-401.3. |
Findings: Based on facility documentation and the Surveyor's observations, Staff #1 worked in the capacity of a teacher-caregiver in the Grows classroom, Staff #1 did not qualify as a teacher-caregiver as the file lacked 6 months experience. | |||
2021-11-12 | 2021-12-28 | article 5 | R9-5-501.A.12 |
Findings: Based on the Surveyor's observations, in the Explorer's classroom, there was a hole in the wall below the books that had exposed drywall. | |||
2021-11-12 | 2021-12-28 | article 5 | R9-5-501.C.5.a-k. |
Findings: Based on the Surveyor's observations, the Explorers classroom lacked a dated lesson plan. | |||
2021-11-12 | 2021-12-28 | article 5 | R9-5-503.A.1.a.b. |
Findings: Based on the Surveyor's observations, in the Explorer's classroom, the diaper changing table had a hole in the middle of the table and lacked a sanitizable surface. | |||
2021-11-12 | 2021-12-28 | Article 6 | R9-5-603.E.1.2. |
Findings: Based on the Surveyor's observations, the outdoor activity area lacked the following: * 5" of the required 6" of pea gravel by the small slide. * 4" of the required 6" of pea gravel by the beige climber and the large slide. * 2" of the required 6" of pea gravel by the orange spinner. | |||
2021-11-12 | 2021-12-28 | Article 6 | R9-5-605.B.1. |
Findings: Based on the Surveyor's observations, in both the Explorer's and the Grow's classrooms, the emergency exit doors were locked. | |||
2021-03-12 | 2021-06-18 | article 4 | R9-5-401.1. |
Findings: Based on facility documentation and the Team Leader and Surveyor's observations, Staff #1 was designated as the facility director. Staff #1 lacked Director qualifications because the file lacked documentation of 3 months of experience. | |||
2021-03-12 | 2021-06-18 | article 4 | R9-5-401.2. |
Findings: Based on facility documentation and the Team Leader and Surveyor's observations, Staff #2 was designated as the Director designee. Staff #2 lacked designee qualifications because the file lacked documentation of 30 hours of training or 3 credit hours in early childhood, child development, or a closely related field from an accredited college or university. | |||
2021-03-12 | 2021-06-18 | Article 4 | R9-5-402.A.1-12 |
Findings: Based on facility documentation and the Team Leader and Surveyor's observations, the file for Staff #1 lacked a written statement attesting to current immunity against measles, rubella, diphtheria, mumps, and pertussis and two good faith references. | |||
2021-03-12 | 2021-06-18 | article 5 | R9-5-501.A.12 |
Findings: Based on the Team Leader and Surveyor's observations, the restroom doors in the Grow's classroom and the hallway, had chipped wood along the base of both doors. | |||
2021-03-12 | 2021-06-18 | Article 5 | R9-5-501.A.21.a.b. |
Findings: Based on the Team Leader and Surveyor's observations, the following items were located in the restrooms:: Hallway restroom #1: A plunger next to the toilet. Hallway restroom #2: A toilet brush next to the toilet | |||
2021-03-12 | 2021-06-18 | Article 5 | R9-5-512.C.2.a-c. |
Findings: Based on the Team Leader and Surveyor's observations, the Hallway restroom #1's floor was missing a 2" piece of tile. | |||
2021-03-12 | 2021-06-18 | Article 5 | R9-5-512.F.8. |
Findings: Based on the Team Leader and Surveyor's observations, the Hallway restroom #1 had a leaky faucet. | |||
2021-03-12 | 2021-06-18 | Article 5 | R9-5-514.A.1-6. |
Findings: Based on the Team Leader and Surveyor's observations, the first aid kit lacked gauze rolls and antiseptic solution or sealed antiseptic wipes. |
If you are a provider and you believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Be the first to review this childcare provider. Write a review about Little Citizens Preschool. Let other families know what’s great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.
Connect, Seek Advice, Share Knowledge