Description: WILL ROGERS HEAD START is a Child Care Center in OKLAHOMA CITY OK, with a maximum capacity of 75 children. This child care center helps with children in the age range of 3 Years, 4 Years, 5 Years. The provider does not participate in a subsidized child care program.
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable, but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns, as the provider may have already addressed some or all issues. Reports can also be verified with your local daycare licensing office.
Date | Type/Purpose | Corrections |
---|---|---|
2021-06-02 | Periodic Full Inspection |
|
Description: No non-compliances observed | ||
2020-01-13 | Periodic Full Inspection |
Plan: I will began to document each time the alarm panel is checked. Correction Date: 2020-01-13 |
Description:
340:110-3-279(f)(2)(B) - checked at least monthly by viewing the control panel and documented per OAC 340:110-3-281.2(c). However, this is not required when a company continuously monitors the system for full-function as documented per OAC 340:110-3-281.2(c); and
The control panel for the smoke detection and carbon monoxide detection was not checked for the month of December 2019. |
||
2020-01-13 | Periodic Full Inspection |
Plan: The tornado drill will be completed by the associated date and I will document each time a tornado drill is completed. Correction Date: 2020-01-24 |
Description:
340:110-3-279(g)(1)(C)(i)(II) - tornado drills conducted by sheltering in pre-determined on-site locations.
Tornado drill was not completed for the month of December 2019. |
||
2020-01-13 | Periodic Full Inspection |
Plan: Personnel is working on updating the paper work to attain a current PDL. Personnel will have an updated PDL by the associated date. I will remind employees to check PDL dates. Correction Date: 2020-04-13 |
Description:
340:110-3-284(b)(3) - Oklahoma Professional Development Ladder. Prior to or within 12 months of employment, teaching personnel obtain and maintain a current Oklahoma Professional Development Ladder (OPDL) certificate, per OAC 340 Appendix FF Oklahoma Professional Development Ladder.
One personnel's professional development ladder expired on 11-21-19 who has been employed at the program for over 12 months. |
||
2019-09-16 | Other Partial Inspection |
|
Description: No non-compliances observed | ||
2019-08-30 | Periodic Full Inspection |
Plan: I will check the smoke and carbon monoxide alarm monthly and I will log the checks each month. The alarm will be checked by the associated date. Correction Date: 2019-08-30 |
Description:
340:110-3-279(f)(2)(B) - checked at least monthly by viewing the control panel and documented per OAC 340:110-3-281.2(c). However, this is not required when a company continuously monitors the system for full-function as documented per OAC 340:110-3-281.2(c); and
Smoke and carbon monoxide alarm system were not being checked monthly. |
||
2019-04-04 | Periodic Full Inspection |
Plan: Personnel will apply for a PDL renewal upon return. Director will ensure all personnel apply for a PDL renewal and submit training hours prior to expiration date. Correction Date: 2019-05-19 |
Description:
340:110-3-284(b)(3) - Oklahoma Professional Development Ladder. Prior to or within 12 months of employment, teaching personnel obtain and maintain a current Oklahoma Professional Development Ladder (OPDL) certificate, per OAC 340 Appendix FF Oklahoma Professional Development Ladder.
One personnel has a PDL which expired on 2/19/19 |
||
2018-11-14 | Periodic Full Inspection |
Plan: The program will complete a tornado drill by: The program will complete all required monthly drills every month. Correction Date: 2018-11-19 |
Description:
340:110-3-279(g)(1)(C)(i)(II) - tornado drills conducted by sheltering in pre-determined on-site locations.
The program has not completed a tornado drill for last month. The last completed tornado drill was in September of this year (9/28/18). |
||
2018-07-02 | Periodic Full Inspection |
Plan: The program has submitted the required paperwork to CECPD and will contact them as soon as possible Correction Date: 2018-08-15 |
Description:
340:110-3-284(b)(3) - Oklahoma Professional Development Ladder. Prior to or within 12 months of employment, teaching personnel obtain and maintain a current Oklahoma Professional Development Ladder (OPDL) certificate, per OAC 340 Appendix FF Oklahoma Professional Development Ladder.
Two employees have worked for the program for over 12 months and do not have current Oklahoma Professional Development Ladder certifications. |
||
2018-01-31 | Periodic Full Inspection |
Plan: The program will conduct and document monthly tornado drills by: Correction Date: 2018-02-07 |
Description:
340:110-3-279(g)(1)(C)(i)(II) - tornado drills conducted by sheltering in pre-determined on-site locations.
There is no documentation of monthly tornado drills. |
||
2018-01-31 | Periodic Full Inspection |
Plan: The program completed an equipment inventory over the summer, but they are unable to locate it at this time. They will send the equipment inventory checklist to Licensing by: Correction Date: 2018-02-07 |
Description:
340:110-3-302(a)(3)(B) - conducts an equipment inventory at least every 12 months. Documentation is maintained per OAC 340:110-3-281.2(c).
The program does not have documentation of a current equipment inventory. |
||
2017-06-22 | Periodic Full Inspection |
|
Description:
No non-compliances observed No non-compliances observed No non-compliances observed No non-compliances observed |
||
2017-01-25 | Follow Up Partial Inspection |
|
Description:
No non-compliances observed No non-compliances observed No non-compliances observed No non-compliances observed |
||
2017-01-23 | Periodic Full Inspection |
Plan: Will make sure that all classrooms are in ratio at all times during childcare. Correction Date: 2017-01-24 |
Description:
340:110-3-286(a) - Ratios. Ratios mean the number of teaching personnel required to be physically present with a child or group of children per Oklahoma Administrative Code (OAC) 340 Appendix GG - Ratios and Group Sizes. Only teaching personnel count in ratios, unless the requirements specifically state otherwise. The program is required to maintain ratios at all times.
Classroom 5, had 14 children ages 3-5yrs with seven 3 year olds present with one staff |
||
2017-01-23 | Periodic Full Inspection |
Plan: Will have the fire extinguisher tagged by: Correction Date: 2017-01-26 |
Description:
340:110-3-279(f)(2)(C) - inspected and tagged at least every 12 months by a state licensed authority.
Fire extinguisher in the kitchen was not tagged |
If you are a provider and you believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Be the first to review this childcare provider. Write a review about Will Rogers Head Start. Let other families know what’s great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.