Description: PITTER-PATTER'S DAY CARE is a Child Care Center in ELK CITY OK, with a maximum capacity of 105 children. This child care center helps with children in the age range of 0 - 11 Months, 12 - 23 Months, 2 Years, 3 Years, 4 Years, 5 Years, 6 Years and Older. The provider also participates in a subsidized child care program.
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable, but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns, as the provider may have already addressed some or all issues. Reports can also be verified with your local daycare licensing office.
Date | Type/Purpose | Corrections |
---|---|---|
2021-08-19 | Periodic Full Inspection |
Plan: Director stated she is currently working on additional hours to renew her Director's credential. Correction Date: 2021-10-19 |
Description:
340:110-3-284.1(b)(C) - has a current bronze or higher level certificate per OAC 340 Appendix EE - Oklahoma Director's Credential;
Program Director's credential has expired. |
||
2021-08-19 | Periodic Full Inspection |
Plan: Director stated she is currently working on additional hours to renew her PDL. Correction Date: 2021-10-19 |
Description:
340:110-3-284(d)(8)(A) - The director obtains at least the required number of professional development clock-hours to maintain a current Oklahoma Director's Credential per OAC 340 Appendix EE - Oklahoma Director's Credential. However, informal professional development clock-hours are limited.
Program Director's PDL has expired. |
||
2021-04-27 | Periodic Full Inspection |
Plan: Director stated she called the lumber yard and gravel yard for impact material. She is on a waiting list to receive impact material. In the future Director will maintain impact of 6" in use zones. Correction Date: 2021-05-27 |
Description:
340:110-3-301(c)(11)(B)(i)(I) - are maintained at a depth of at least six inches by replacing, leveling, or raking. In addition, rubber mulch, EWF, and any other loose-fill material that is tested by the American Society for Testing and Materials International (ASTM) must comply with ASTM impact attenuation and EWF guidelines;
Two jungle gyms do not have 6" of impact material under slides. |
||
2021-04-27 | Periodic Full Inspection |
Plan: Director stated she will date lesson plans in the classrooms. In the future lesson plans will be dated weekly as required. Correction Date: 2021-04-27 |
Description:
340:110-3-281.1(i)(6) - Weekly lesson plans. The program posts lesson plans with the dates and required content per OAC 340:110-3-289(d). Classrooms may only share this item when the lesson plan is applicable to each classroom.
Four classrooms do not have dated weekly lesson plans. |
||
2021-04-27 | Periodic Full Inspection |
Plan: Director texted parents during the visit requesting immunization records. In the future Director will have immunization records on every child accessible. Correction Date: 2021-05-04 |
Description:
340:110-3-281.4(b)(6) - Immunization records. An immunization record or exemption is obtained prior to the first day of attendance and is updated when the child receives additional vaccines.
Four children in infants and 1 year olds classroom do not have shot records. |
||
2021-04-27 | Periodic Full Inspection |
Plan: Director stated personnel is working to update their PDL's. In the future Director will makes sure personnel's PDL's are up to date. Correction Date: 2021-05-27 |
Description:
340:110-3-284(b)(3) - Oklahoma Professional Development Ladder. Prior to or within 12 months of employment, teaching personnel obtain and maintain a current Oklahoma Professional Development Ladder (OPDL) certificate, per OAC 340 Appendix FF Oklahoma Professional Development Ladder.
Four personnel do not have current PDL's. |
||
2020-11-10 | Follow Up Partial Inspection |
|
Description: No non-compliances observed | ||
2020-11-09 | Complaint Full Inspection |
Plan: Personnel-in-Charge stated she will discuss importance of safe sleep practice with personnel in infant room. Licensing informed Personnel that infants cannot sleep in baby swings and both infants were immediately moved to cribs while Licensing was in the classroom. In the future, infants will be moved to appropriate rest equipment if infants fall asleep in equipment other than appropriate rest equipment. Correction Date: 2020-11-09 |
Description:
340:110-3-296(b)(2)(B)(ii) - When an infant falls asleep in equipment other than appropriate rest equipment, the infant is immediately moved to appropriate rest equipment.
2 infants sleeping in baby swings |
||
2020-11-09 | Complaint Full Inspection |
Plan: Personnel-in-Charge stated she will inform Owner/Director needs to order pea gravel to add to use zone of jungle gym so 6" impact accessible under slides. In the future, 6" impact accessible in use zone of jungle gym. Correction Date: 2020-12-09 |
Description:
340:110-3-301(c)(11)(B)(i)(I) - are maintained at a depth of at least six inches by replacing, leveling, or raking. In addition, rubber mulch, EWF, and any other loose-fill material that is tested by the American Society for Testing and Materials International (ASTM) must comply with ASTM impact attenuation and EWF guidelines;
Does not have 6" impact accessible under slides with dirt visible in use zone of jungle gym |
||
2020-11-09 | Complaint Full Inspection |
Plan: Personnel-in-Charge stated the personnel has submitted application to CECPD to renew OPDL. In the future, OPDL applications are submitted prior to expiration 60 days prior to expiration. Correction Date: 2020-12-09 |
Description:
340:110-3-284.2(b)(2)(C) - have a current Oklahoma Professional Development Ladder (OPDL) certificate, per OAC 340 Appendix FF - Oklahoma Professional Development Ladder of:
One personnel does not have current OPDL (expired 09-04-20) |
||
2019-11-19 | Periodic Full Inspection |
Plan: Director said she will have all 5 personnel obtain current OPDL's by applying with CECPD and obtaining current OPDL's. In the future, all personnel will maintain current OPDL's by renewing OPDL's 60 days prior to expiration. Correction Date: 2019-12-19 |
Description:
340:110-3-284(b)(3) - Oklahoma Professional Development Ladder. Prior to or within 12 months of employment, teaching personnel obtain and maintain a current Oklahoma Professional Development Ladder (OPDL) certificate, per OAC 340 Appendix FF Oklahoma Professional Development Ladder.
5 personnel do not have current OPDL's and employed over one year |
||
2019-07-25 | Periodic Full Inspection |
Plan: Director said the 2 personnel have to renew their CDA's before CECPD will renew PDL's. Director said both personnel are working on renewing CDA's and will submit applications to renew PDL's as soon as CDA's are current. In the future, PDL's are maintained in current status by applying to renew PDL's 60 days prior to expiration. Correction Date: 2019-08-25 |
Description:
340:110-3-284(b)(3) - Oklahoma Professional Development Ladder. Prior to or within 12 months of employment, teaching personnel obtain and maintain a current Oklahoma Professional Development Ladder (OPDL) certificate, per OAC 340 Appendix FF Oklahoma Professional Development Ladder.
2 personnel do not have current PDL's (expired 01-07-18 & 07-05-19) |
||
2019-07-25 | Periodic Full Inspection |
Plan: Director said she will move cleaning supplies to cabinets that are inaccessible to children. In the future, bathrooms are checked daily to ensure no toxic items are accessible to children. Correction Date: 2019-07-25 |
Description:
340:110-3-303(e) - Toxic materials. Toxic materials, such as health and beauty aids, cleaning materials, and pesticides are inaccessible.
Cleaning supplies accessible in 2 bathrooms |
||
2019-07-25 | Periodic Full Inspection |
Plan: Director said she has ordered pea gravel to place in use zone of jungle gym. In the future, 6" impact will be maintained by raking/replacing pea gravel as required. Correction Date: 2019-08-25 |
Description:
340:110-3-301(c)(11)(B)(i)(I) - are maintained at a depth of at least six inches by replacing, leveling, or raking. In addition, rubber mulch, EWF, and any other loose-fill material that is tested by the American Society for Testing and Materials International (ASTM) must comply with ASTM impact attenuation and EWF guidelines;
Does not have 6" impact in use zone of jungle gym |
||
2019-05-29 | Follow Up Partial Inspection |
|
Description: No non-compliances observed |
If you are a provider and you believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Write a review about Pitter-patter's Day Care. Let other families know what’s great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.
Connect, Seek Advice, Share Knowledge
I know daycare is scarce in this area but allowing children to repeatedly bite others (more than 10 instances of one child biting just my family member!) Is not acceptable !! They've been reported to DHS multiple times just for this incident! Imagine the instances that no one reported! Please report, because nothing will happen if you dont!
The lady who introduced herself to me as the owner was very unprofessional. I witnessed her yelling at another child's parent. I would not recommend this daycare to anyone.