Quarry Hill School, Inc
Quick Facts
Missing details such as transportation or rates? Suggest an update to help other families.
Reviews
Write a Review
Be the first to review this childcare provider. Write a review about Quarry Hill School, Inc. Let other families know what's great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.
About the Provider
Hours of Operation
- Days of Operation Monday - Friday
- Open Hours08:30:00 to 15:00:00
Inspection/Report History
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns. Reports can also be verified with your local daycare licensing office.
| Type | Create Date | Due Date | Corrected Date | Status |
|---|---|---|---|---|
| Violation | 2023-10-04 | 2023-10-11 | 2023-10-04 | Final |
| Regulation/Restriction: 5.4.1.4: Cots, mats, and mattresses shall be nonporous or have nonporous coverings. Each child shall be provided clean, individual bed linens either by the licensee providing them directly or requiring parents to provide them. No child shall nap directly on nonporous coverings. | ||||
| Violation | 2023-10-04 | 2023-10-05 | 2023-10-04 | Final |
| Regulation/Restriction: 3.4.3: A system for taking attendance, including documentation of the time when each child arrives and departs each day he/she attends the CBCCPP, shall be established. The licensee shall save all daily attendance records identifying the hours of children's attendance for at least twelve (12) months from the date that care is provided. | ||||
| Violation | 2022-10-07 | 2022-10-20 | 2022-10-26 | Final |
| Regulation/Restriction: 5.10.3.3: Safe Use Zones For all play equipment that is thirty (30) inches or higher from the ground, including climbing equipment, slides, swings and other similar equipment, the licensee shall ensure that the surface under and around the equipment, including recommended use zones, is of approved resilient material that protects children if they fall. * Materials in the use zone shall consist of wood chips, pea stone, mulch, engineered wood fibers, sand, safety-tested shredded or rubber like material or rubber mats designed for protective cushioning; * Materials used in the use zone shall follow the recommendations listed in the most recent publication of U.S. Consumer Product Safety Commission's Public Playground Safety Handbook regarding critical depth of tested materials determined by the height of the highest climbing surface of the equipment; * Materials used in the use zone shall be installed and maintained according to the manufacturer's instructions; * If the loose material such as sand, mulch, or shredded rubber is used in use zones, the licensee shall ensure that the material is raked regularly and replenished to maintain depth and resilience; and * If the resilient material in use zones freezes, staff shall ensure that children will not play on the equipment until the resilient material has thawed and is once again resilient. | ||||
| Violation | 2022-10-07 | 2022-10-20 | 2022-10-26 | Final |
| Regulation/Restriction: 3.7.2.2: The licensee shall ensure that evacuation drills are conducted at least once a month, and children and staff are evacuated in under three (3) minutes. Licensees of a CBCCPP located within a public or independent school building may count a lock-down drill performed while the CBCCPP is in operation in place of a monthly evacuation drill with the CBCCPP children and staff and at least three (3) of the monthly drills conducted within 365 days shall be evacuation drills. | ||||
| Violation | 2021-03-03 | 2021-04-06 | 2021-04-13 | Final |
| Regulation/Restriction: 3.7.2.2: The licensee shall ensure that evacuation drills are conducted at least once a month, and children and staff are evacuated in under three (3) minutes. Licensees of a CBCCPP located within a public or independent school building may count a lock-down drill performed while the CBCCPP is in operation in place of a monthly evacuation drill with the CBCCPP children and staff and at least three (3) of the monthly drills conducted within 365 days shall be evacuation drills. | ||||
| Violation | 2021-03-03 | 2021-04-06 | 2021-04-13 | Final |
| Regulation/Restriction: 3.4.7.3: Within six (6) months of the initial date of employment; staff and auxiliary staff left alone with children and/or counted in staff/child ratio as specified in the rule 6.2.1.8 of these regulations, and the program director shall maintain an up-to-date BFIS Quality and Credential Account. Documentation, verification of qualifications, and all annual professional development activities as specified in the rules in sections 7.3 and 7.4 of these regulations shall be submitted to Northern Lights at CCV to be verified and maintained in BFIS. | ||||
| Violation | 2021-03-03 | 2021-04-06 | 2021-04-13 | Final |
| Regulation/Restriction: 7.1.2.2: Staff who are counted in the staff/child ratios and auxiliary staff left alone with children and/or counted in staff/child ratio as specified in the rule 6.2.1.8 of these regulations shall obtain training in pediatric first aid and in infant and child CPR within three (3) months of beginning work in the CBCCPP and remain currently certified. | ||||
| Violation | 2021-03-03 | 2021-04-06 | 2021-04-13 | Final |
| Regulation/Restriction: 5.1.2: General Health Examinations: Within forty-five (45) days of enrollment, the licensee shall obtain documentation of the child's age appropriate well care exam from the parent. Documentation shall include information regarding any health conditions and medications that may impact the care of the child. | ||||
If you are a provider and believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Ask the Community
Connect, seek advice, share knowledge.
Providers in ZIP Code 05753
Looking for Child Care?