Little Guppy Child Development Center
Quick Facts
Missing details such as transportation or rates? Suggest an update to help other families.
Contact Information
📞 (636) 916-4280Reviews
Write a Review
Be the first to review this childcare provider. Write a review about Little Guppy Child Development Center. Let other families know what's great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.
About the Provider
Hours of Operation
- Monday6:00 AM- 9:00 PM
- Tuesday6:00 AM- 9:00 PM
- Wednesday6:00 AM- 9:00 PM
- Thursday6:00 AM- 9:00 PM
- Friday6:00 AM- 9:00 PM
- Saturday Closed
- Sunday Closed
Inspection/Report History
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns. Reports can also be verified with your local daycare licensing office.
| Report Date | Report Type | Violations |
|---|---|---|
| 2026-06-18 | COMPLIANCE MONITORING | No violations cited |
| 2025-12-04 | COMPLIANCE MONITORING | No violations cited |
| 2025-07-25 | COMPLAINT INVESTIGATION | |
| 2025-06-09 | COMPLIANCE VERIFICATION | 1 violation cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located in the Seahourse room was/were not in good condition as evidenced by hole in the wall. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 6/2/2025 |
||
| 2025-06-03 | COMPLIANCE MONITORING | 1 violation cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located in the Seahourse room was/were not in good condition as evidenced by hole in the wall. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation |
||
| 2025-02-25 | SUPPLEMENTAL | 1 violation cited |
|
Findings: 5 CSR 25-500.182 Child Care Program Violation: A child was left without competent supervision as evidenced by it was self reported that a child age 2-years-old was left unsupervised indoors for approximately five minutes. Rule Reference: 5 CSR 25-500.182 Child Care Program (1) (A) 1. states: Caregivers shall not leave any child without competent supervision. Correction Required: The facility shall provide competent supervision for each child as required. Correction Verification: Corrected on Site Compliance Date: 2/18/2025 |
||
| 2025-01-23 | COMPLIANCE VERIFICATION | 1 violation cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Window and door requirements were not met as evidenced by the screen was not in good repair in that one screen was torn in the Pre-K Class. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 2. states: Open windows and doors shall be screened securely. Barriers to prevent children from falling against windows or falling from windows shall be provided when windows are less than twenty-four inches (24") from the floor and not constructed of safety glass or other nonbreakable material. Correction Required: Open windows and doors shall be screened securely and barriers shall be installed as required. Correction Verification: Submit Documentation Compliance Date: 1/23/2025 |
||
| 2024-12-12 | COMPLIANCE MONITORING | 5 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Window and door requirements were not met as evidenced by the screen was not in good repair in that one screen was torn in the Pre-K Class. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 2. states: Open windows and doors shall be screened securely. Barriers to prevent children from falling against windows or falling from windows shall be provided when windows are less than twenty-four inches (24") from the floor and not constructed of safety glass or other nonbreakable material. Correction Required: Open windows and doors shall be screened securely and barriers shall be installed as required. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Hazardous items as follows were accessible to children: Bleach water. The item(s) was/were located in an unlocked cabinet in the Toddler Classroom accessible to children. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (I) states: All flammable liquids, matches, cleaning supplies, poisonous materials, medicines, alcoholic beverages, hazardous personal care items or other hazardous items shall be inaccessible to children. Correction Required: Hazardous items shall be inaccessible to children. Correction Verification: Corrected on Site Compliance Date: 12/12/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Hazardous items as follows were accessible to children: Method Multi Purpose cleaner. The item(s) was/were located in an unlocked cabinet in the Two's Classroom accessible to children. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (I) states: All flammable liquids, matches, cleaning supplies, poisonous materials, medicines, alcoholic beverages, hazardous personal care items or other hazardous items shall be inaccessible to children. Correction Required: Hazardous items shall be inaccessible to children. Correction Verification: Corrected on Site Compliance Date: 12/12/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Hazardous items as follows were accessible to children: Clorox Cceaner. The item(s) was/were located in an unlocked cabinet in the Threes Classroom accessible to children. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (I) states: All flammable liquids, matches, cleaning supplies, poisonous materials, medicines, alcoholic beverages, hazardous personal care items or other hazardous items shall be inaccessible to children. Correction Required: Hazardous items shall be inaccessible to children. Correction Verification: Corrected on Site Compliance Date: 12/12/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The requirements for protective outlet covers or twist-lock outlets were not met as evidenced by electrical outlets were not covered in that one receptacle in the Two's Classroom was missing. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (G) states: Protective outlet covers or twist-lock outlets shall be used in areas accessible to the children. Correction Required: The facility shall use outlet covers or twist-lock outlets as required. Correction Verification: Corrected on Site Compliance Date: 12/12/2024 |
||
| 2024-07-21 | COMPLIANCE VERIFICATION | 2 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located the Three Year Old Room was/were not in good condition as evidenced by peeling and chipping paint. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 7/18/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility did not have a fenced outdoor play area that was on or adjoining the day care property and was accessible without hazard as evidenced by the fence had openings that were between 3.5 and 9 inches and allow entrapment - the openings measured seven inches. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 1. states: A fenced outdoor play area shall be available on or adjoining the day care property. The play area shall be located so it is convenient and the children can gain access to it without hazard. For facilities initially licensed after the effective date of these rules or for the installation of new fences in existing facilities, the fence shall be at least forty-two inches (42") high. An outdoor play area used exclusively for school-age children shall not be required to have a fence. Fences shall be constructed to prevent children from crawling or falling through or becoming entrapped. Correction Required: The outdoor play area shall be accessible without hazard. Correction Verification: Submit Documentation Compliance Date: 7/18/2024 |
||
| 2024-06-18 | COMPLIANCE MONITORING | 3 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Hazardous items as follows were accessible to children: Lysol Wipes and diaper ointment. The item(s) was/were located in an unlocked cabinet in the infant room. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (I) states: All flammable liquids, matches, cleaning supplies, poisonous materials, medicines, alcoholic beverages, hazardous personal care items or other hazardous items shall be inaccessible to children. Correction Required: Hazardous items shall be inaccessible to children. Correction Verification: Corrected on Site Compliance Date: 6/18/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located the Three Year Old Room was/were not in good condition as evidenced by peeling and chipping paint. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility did not have a fenced outdoor play area that was on or adjoining the day care property and was accessible without hazard as evidenced by the fence had openings that were between 3.5 and 9 inches and allow entrapment - the openings measured seven inches. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 1. states: A fenced outdoor play area shall be available on or adjoining the day care property. The play area shall be located so it is convenient and the children can gain access to it without hazard. For facilities initially licensed after the effective date of these rules or for the installation of new fences in existing facilities, the fence shall be at least forty-two inches (42") high. An outdoor play area used exclusively for school-age children shall not be required to have a fence. Fences shall be constructed to prevent children from crawling or falling through or becoming entrapped. Correction Required: The outdoor play area shall be accessible without hazard. Correction Verification: Submit Documentation |
||
| 2024-01-30 | COMPLIANCE VERIFICATION | 2 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located in the sea turtles room was/were not in good condition as evidenced by a hole in the tile in the bathroom. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 1/16/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located in every class room was/were not finished with material which can be cleaned easily as evidenced by wall patching areas were not painted over. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 12/21/2023 |
||
| 2023-12-01 | COMPLIANCE MONITORING | 6 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located in every class room was/were not finished with material which can be cleaned easily as evidenced by wall patching areas were not painted over. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Bathroom supplies were not available and accessible to children as evidenced by there were no paper towels. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (3) (A) 4. states: Paper towels, soap and toilet paper shall be provided and easily accessible so the children can reach them without assistance. Correction Required: The facility shall provide paper towels, soap and toilet paper, accessible for children's use. Correction Verification: Corrected on Site Compliance Date: 12/1/2023 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located in the sea turtles room was/were not in good condition as evidenced by a hole in the tile in the bathroom. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.090 Disaster and Emergency Preparedness Violation: The facility's special instructions for infants and non-ambulatory children were not posted in each room. Rule Reference: 5 CSR 25-500.090 Disaster and Emergency Preparedness (2) (B) 3. states: Any special instructions for infants and non-ambulatory children; Correction Required: Facility must post information as required. Correction Verification: Corrected on Site Compliance Date: 12/1/2023 5 CSR 25-500.092 Furniture, Equipment and Materials Violation: Sleeping equipment was not arranged to provide required spacing as evidenced by there was no aisle on the long side of the napping equipment. Rule Reference: 5 CSR 25-500.092 Furniture, Equipment and Materials (1) (B) 1. D. states: Sleeping equipment shall be arranged to provide at least a two foot (2') aisle on one (1) long side of the equipment. Correction Required: Caregivers shall provide a two foot (2') aisle on one long side of the napping equipment. Correction Verification: Corrected on Site Compliance Date: 12/1/2023 5 CSR 25-500.092 Furniture, Equipment and Materials Violation: Requirements for the crib mattress/playpen padding/bedding were not met as evidenced by a fitted sheet was not used. Rule Reference: 5 CSR 25-500.092 Furniture, Equipment and Materials (1) (B) 2. D. states: The crib mattress or playpen pad shall be sized correctly to the crib or playpen, in good condition, waterproof and kept clean and dry, be firm and maintain its shape even when the fitted sheet designated for that model is used, such that there are no gaps between the mattress and the side of the crib or playpen. Only fitted sheets shall be used. Only fitted sheet shall be used and shall be changed immediately when soiled or wet. Correction Required: Sleeping equipment shall meet safety and sanitation requirements. Correction Verification: Corrected on Site Compliance Date: 12/1/2023 |
||
| 2023-06-13 | COMPLIANCE MONITORING | |
| 2022-12-13 | COMPLIANCE VERIFICATION | |
| 2022-12-08 | COMPLIANCE MONITORING | |
| 2022-06-21 | COMPLIANCE VERIFICATION | |
| 2022-06-16 | COMPLIANCE MONITORING | |
If you are a provider and believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Providers in ZIP Code 63301
Looking for Child Care?