Description: At ZIS, students participate in Spanish immersion. They begin the process with a full-day kindergarten program that exposes students to all of the required kindergarten learning objectives in a foreign language, called the “target languageâ€. With the exception of one 45-minute daily period for PE, art or music, all instruction is presented entirely in the target language This full immersion approach continues until the mid-point of second grade, at which time English reading/language arts is introduced into the curriculum for about an hour each day.
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable, but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns, as the provider may have already addressed some or all issues. Reports can also be verified with your local daycare licensing office.
Date | Type/Purpose | Corrections |
---|---|---|
2021-07-13 | Periodic Full Inspection |
|
Description: No non-compliances observed | ||
2019-09-09 | Periodic Full Inspection |
|
Description: No non-compliances observed | ||
2019-03-25 | Periodic Full Inspection |
|
Description: No non-compliances observed | ||
2019-03-25 | Periodic Full Inspection |
Plan: Typing non-compliance due to error: No current compliance file notifications for records samples. Typed for provider: Facility will have parents sign updated forms and ensure they are completed every 365 days per policy. Correction Date: 2019-03-29 |
Description: 340:110-3-281.2(c)(7)(B)(1) - Parents complete DHS forms every 12 months regarding insurance liability and the compliance file. Forms are maintained at the facility. 6 | ||
2018-11-14 | Periodic Full Inspection |
Plan: Typed for provider: facility will obtain contract information showing it is continuously monitored and/or will begin testing monthly. Facility will ensure smoke and carbon monoxide detectors are tested monthly or contract showing they are continuously monitored will be maintained at all times. Correction Date: 2018-11-21 |
Description:
340:110-3-279(f)(2)(B) - checked at least monthly by viewing the control panel and documented per OAC 340:110-3-281.2(c). However, this is not required when a company continuously monitors the system for full-function as documented per OAC 340:110-3-281.2(c); and
Program does not have documentation of continuous monitoring or monthly checking of smoke and carbon monoxide detectors. |
||
2018-05-03 | Periodic Full Inspection |
|
Description:
No non-compliances observed No non-compliances observed |
||
2018-03-29 | Periodic Full Inspection |
|
Description:
No non-compliances observed No non-compliances observed No non-compliances observed |
||
2017-10-10 | Periodic Full Inspection |
Plan: will print up and post in class Correction Date: 2017-10-13 |
Description:
340:110-3-281.1(i)(3) - Evacuation routes. A floor plan with primary and secondary evacuation routes from the classroom(s) is posted. Routes are not combined with other posted items, except for program information, emergency numbers, and locations of first aid kits, emergency supply kits, and fire extinguishers per (1) and (2) of this subsection. Items are paper only.
evacuation route not posted in the classroom |
||
2017-10-10 | Periodic Full Inspection |
Plan: will print and post ratio requirements in both classes Correction Date: 2017-10-13 |
Description:
340:110-3-281.1(i)(4) - Ratios and group sizes. The applicable program-type ratios and group sizes per OAC 340 Appendix GG - Ratios and Group Sizes are posted.
ratio and group size was not posted in either class area |
||
2017-10-10 | Periodic Full Inspection |
Plan: will contact custodian to get monthly check dates Correction Date: 2017-10-20 |
Description:
340:110-3-279(f)(2)(B) - checked at least monthly by viewing the control panel and documented per OAC 340:110-3-281.2(c). However, this is not required when a company continuously monitors the system for full-function as documented per OAC 340:110-3-281.2(c); and
no checks have been documented since school has started |
||
2017-03-21 | Periodic Full Inspection |
Plan: Director will locate this documentation and have available for licensing and will document checks monthly Correction Date: 2017-03-31 |
Description:
340:110-3-281.2(c)(4)(C) - Individual smoke and carbon monoxide alarm tests. Item includes the dates the tests are conducted.
there is no documentation available of these items being checked. |
||
2017-03-21 | Periodic Full Inspection |
Plan: director will find documentation and make available for review during licensing visit Correction Date: 2017-03-31 |
Description:
340:110-3-281.2(c)(4)(F) - Lock-down and relocation procedure reviews. Item includes dates the reviews are completed by personnel.
documentation with dates is not available at this time. |
If you are a provider and you believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Be the first to review this childcare provider. Write a review about Zarrow International School. Let other families know what’s great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.