Tlc Childcare Llc
Quick Facts
Missing details such as transportation or rates? Suggest an update to help other families.
Reviews
Write a Review
Be the first to review this childcare provider. Write a review about Tlc Childcare Llc. Let other families know what's great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.
About the Provider
Hours of Operation
- Monday6:00 AM- 6:00 PM
- Tuesday6:00 AM- 6:00 PM
- Wednesday6:00 AM- 6:00 PM
- Thursday6:00 AM- 6:00 PM
- Friday6:00 AM- 6:00 PM
- Saturday Closed
- Sunday Closed
Inspection/Report History
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns. Reports can also be verified with your local daycare licensing office.
| Report Date | Report Type | Violations |
|---|---|---|
| 2026-04-07 | COMPLIANCE VERIFICATION | 2 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The requirements for protective outlet covers or twist-lock outlets were not met as evidenced by electrical outlets were not covered in that 6 outlets in the basement were did not have covers. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (G) states: Protective outlet covers or twist-lock outlets shall be used in areas accessible to the children. Correction Required: The facility shall use outlet covers or twist-lock outlets as required. Correction Verification: Submit Documentation Compliance Date: 4/7/2026 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located on the staircase to the basement was/were not in good condition as evidenced by there was a patch of peeling paint approximately 9 inches by 2 inches. The paint could be pulled off the wall. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 4/7/2026 |
||
| 2026-01-07 | COMPLIANCE MONITORING | 3 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The requirements for protective outlet covers or twist-lock outlets were not met as evidenced by electrical outlets were not covered in that 6 outlets in the basement were did not have covers. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (G) states: Protective outlet covers or twist-lock outlets shall be used in areas accessible to the children. Correction Required: The facility shall use outlet covers or twist-lock outlets as required. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Hazardous items as follows were accessible to children: Lysol spray, scrubbing bubbles and gloss protective email spray . The item(s) was/were located in an unlocked cabinets in the bathroom. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (I) states: All flammable liquids, matches, cleaning supplies, poisonous materials, medicines, alcoholic beverages, hazardous personal care items or other hazardous items shall be inaccessible to children. Correction Required: Hazardous items shall be inaccessible to children. Correction Verification: Corrected on Site Compliance Date: 1/7/2026 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located on the staircase to the basement was/were not in good condition as evidenced by there was a patch of peeling paint approximately 9 inches by 2 inches. The paint could be pulled off the wall. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation |
||
| 2025-09-25 | COMPLIANCE VERIFICATION | 4 violations cited |
|
Findings: 5 CSR 25-500.052 Annual Requirements Violation: Evidence of local building approval was not received. Rule Reference: 5 CSR 25-500.052 Annual Requirements (1) (B) states: Evidence of compliance with local building and zoning requirements, if applicable. Correction Required: The facility shall submit evidence of local building/zoning approval as required. Correction Verification: Submit Documentation Compliance Date: 9/19/2025 5 CSR 25-500.052 Annual Requirements Violation: The annual sanitation inspection was not approved. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (B) states: Evidence of compliance with local, state, or both, sanitation requirements. Correction Required: The facility shall submit evidence of compliance with annual sanitation requirements. Correction Verification: Submit Documentation Compliance Date: 9/24/2025 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located the 2 year old classroom was/were not in good condition as evidenced by a floor tile was missing. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 9/19/2025 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility's outdoor space was not safe for children's activities as evidenced by the playground has multiple holes in the ground around new fence posts. They measured approximately 1'x1', 3'x1', 2.5'x2, 1'x 8 inches and 6 inches by 6 inches . Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 4. states: The play area shall be safe for children's activities, well-maintained, free of hazards such as poisonous plants, broken glass, rocks or other debris and shall have good drainage. Correction Required: The outdoor play area shall be clean, safe and well-maintained as required. Correction Verification: Submit Documentation Compliance Date: 9/15/2025 |
||
| 2025-08-21 | COMPLIANCE MONITORING | 10 violations cited |
|
Findings: 5 CSR 25-500.052 Annual Requirements Violation: Evidence of local building approval was not received. Rule Reference: 5 CSR 25-500.052 Annual Requirements (1) (B) states: Evidence of compliance with local building and zoning requirements, if applicable. Correction Required: The facility shall submit evidence of local building/zoning approval as required. Correction Verification: Submit Documentation 5 CSR 25-500.052 Annual Requirements Violation: The annual sanitation inspection was not approved. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (B) states: Evidence of compliance with local, state, or both, sanitation requirements. Correction Required: The facility shall submit evidence of compliance with annual sanitation requirements. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Hazardous items as follows were accessible to children: Clorox wipes, Lysol spray, odor eliminator spray, a can of gasoline. The item(s) was/were located an unlocked cabinet in the bathroom, the laundry room and on the floor of the school aged classroom. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (I) states: All flammable liquids, matches, cleaning supplies, poisonous materials, medicines, alcoholic beverages, hazardous personal care items or other hazardous items shall be inaccessible to children. Correction Required: Hazardous items shall be inaccessible to children. Correction Verification: Corrected on Site Compliance Date: 8/21/2025 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located the 2 year old classroom was/were not in good condition as evidenced by a floor tile was missing. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility's outdoor space was not safe for children's activities as evidenced by the playground has multiple holes in the ground around new fence posts. They measured approximately 1'x1', 3'x1', 2.5'x2, 1'x 8 inches and 6 inches by 6 inches . Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 4. states: The play area shall be safe for children's activities, well-maintained, free of hazards such as poisonous plants, broken glass, rocks or other debris and shall have good drainage. Correction Required: The outdoor play area shall be clean, safe and well-maintained as required. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located the school aged classroom was/were not in good condition as evidenced by there was exposed dry wall in a hole in the paint that was approximately 6 inchesx 3 inches . Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Corrected on Site Compliance Date: 8/21/2025 5 CSR 25-500.090 Disaster and Emergency Preparedness Violation: The facility's disaster and emergency plan was not available in each room used for childcare as evidenced by there was no EPP in the school aged classroom. Rule Reference: 5 CSR 25-500.090 Disaster and Emergency Preparedness (2) (A) states: At all times, a copy of the facility's disaster and emergency plan is readily available in the office area and in each room used for care of children; Correction Required: The facilities disaster and emergency plan must be available in required locations. Correction Verification: Corrected on Site Compliance Date: 8/21/2025 5 CSR 25-500.090 Disaster and Emergency Preparedness Violation: The facility's list of emergency numbers are not posted by each telephone, specifically the school aged classroom. Rule Reference: 5 CSR 25-500.090 Disaster and Emergency Preparedness (2) (B) 1. B. states: A list of emergency numbers, including 911, if available, the fire department, police department, ambulance service, poison control center, and local radio station; Correction Required: The facility must post all emergency numbers as required. Correction Verification: Corrected on Site Compliance Date: 8/21/2025 5 CSR 25-500.090 Disaster and Emergency Preparedness Violation: The facility's evacuation route diagram was not posted in each room. Rule Reference: 5 CSR 25-500.090 Disaster and Emergency Preparedness (2) (B) 2. states: A diagram of evacuation routes from the room; Correction Required: Facility must post information as required. Correction Verification: Corrected on Site Compliance Date: 8/21/2025 5 CSR 25-500.090 Disaster and Emergency Preparedness Violation: The facility's special instructions for infants and non-ambulatory children were not posted in each room. Rule Reference: 5 CSR 25-500.090 Disaster and Emergency Preparedness (2) (B) 3. states: Any special instructions for infants and non-ambulatory children; Correction Required: Facility must post information as required. Correction Verification: Corrected on Site Compliance Date: 8/21/2025 |
||
| 2025-08-02 | COMPLAINT INVESTIGATION | |
| 2025-02-13 | COMPLIANCE MONITORING | 2 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Hazardous items as follows were accessible to children: A gallon of paint and a container of Round Up . The item(s) was/were located in an unlocked closet in the school aged classroom. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (I) states: All flammable liquids, matches, cleaning supplies, poisonous materials, medicines, alcoholic beverages, hazardous personal care items or other hazardous items shall be inaccessible to children. Correction Required: Hazardous items shall be inaccessible to children. Correction Verification: Corrected on Site Compliance Date: 2/13/2025 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility's outdoor space was not safe for children's activities as evidenced by there was a pile of trash, cups, bowls, and plastic bags at the bottom of the stairwell outside the school aged classrooms door to outside. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 4. states: The play area shall be safe for children's activities, well-maintained, free of hazards such as poisonous plants, broken glass, rocks or other debris and shall have good drainage. Correction Required: The outdoor play area shall be clean, safe and well-maintained as required. Correction Verification: Corrected on Site Compliance Date: 2/13/2025 |
||
| 2024-08-30 | COMPLAINT INVESTIGATION | |
| 2024-08-16 | COMPLIANCE VERIFICATION | 3 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility did not have a fenced outdoor play area that was on or adjoining the day care property and was accessible without hazard as evidenced by the fence was not in good condition in that the gate separating the infant play space and the older children play space with broken and the chain link was not attached to the frame. The chain link had sharp metal edges exposed. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 1. states: A fenced outdoor play area shall be available on or adjoining the day care property. The play area shall be located so it is convenient and the children can gain access to it without hazard. For facilities initially licensed after the effective date of these rules or for the installation of new fences in existing facilities, the fence shall be at least forty-two inches (42") high. An outdoor play area used exclusively for school-age children shall not be required to have a fence. Fences shall be constructed to prevent children from crawling or falling through or becoming entrapped. Correction Required: The outdoor play area shall be accessible without hazard. Correction Verification: Submit Documentation Compliance Date: 8/15/2024 5 CSR 25-500.092 Furniture, Equipment and Materials Violation: The facility did not meet requirements for music and rhythm activities. The facility needed an additional 16 items in this category. Rule Reference: 5 CSR 25-500.092 Furniture, Equipment and Materials (2) (B) 2. F. states: Music and rhythm activities; Correction Required: The facility shall provide appropriate equipment for children as required. Correction Verification: Submit Documentation Compliance Date: 8/16/2024 5 CSR 25-500.102 Personnel Violation: A facility orientation was not conducted for a caregiver(s) before being left alone with children. The following staff need a facility orientation: Anthony Benson, Kendra Cook, Meagan Bonds, Vincent Williams, Kanyria Spears. Rule Reference: 5 CSR 25-500.102 Personnel (1) (K) . states: The child care provider shall ensure that within seven (7) days of employment or volunteering, and before being left alone with children, that caregivers employed on or after August 30, 2019, receive a facility orientation. The facility orientation shall include-- Correction Required: The facility shall ensure that a facility orientation occurs within 7 days of employment or volunteering and before caregivers are left alone with children. Correction Verification: Submit Documentation Compliance Date: 8/14/2024 |
||
| 2024-08-07 | COMPLIANCE MONITORING | 5 violations cited |
|
Findings: 5 CSR 25-500.052 Annual Requirements Violation: Evidence of local building approval was not received. Rule Reference: 5 CSR 25-500.052 Annual Requirements (1) (B) states: Evidence of compliance with local building and zoning requirements, if applicable. Correction Required: The facility shall submit evidence of local building/zoning approval as required. Correction Verification: Corrected on Site Compliance Date: 8/7/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility did not have a fenced outdoor play area that was on or adjoining the day care property and was accessible without hazard as evidenced by the fence had openings large enough for a child to crawl or fall through - the openings measured 12 inches. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 1. states: A fenced outdoor play area shall be available on or adjoining the day care property. The play area shall be located so it is convenient and the children can gain access to it without hazard. For facilities initially licensed after the effective date of these rules or for the installation of new fences in existing facilities, the fence shall be at least forty-two inches (42") high. An outdoor play area used exclusively for school-age children shall not be required to have a fence. Fences shall be constructed to prevent children from crawling or falling through or becoming entrapped. Correction Required: The outdoor play area shall be accessible without hazard. Correction Verification: Corrected on Site Compliance Date: 8/7/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility did not have a fenced outdoor play area that was on or adjoining the day care property and was accessible without hazard as evidenced by the fence was not in good condition in that the gate separating the infant play space and the older children play space with broken and the chain link was not attached to the frame. The chain link had sharp metal edges exposed. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 1. states: A fenced outdoor play area shall be available on or adjoining the day care property. The play area shall be located so it is convenient and the children can gain access to it without hazard. For facilities initially licensed after the effective date of these rules or for the installation of new fences in existing facilities, the fence shall be at least forty-two inches (42") high. An outdoor play area used exclusively for school-age children shall not be required to have a fence. Fences shall be constructed to prevent children from crawling or falling through or becoming entrapped. Correction Required: The outdoor play area shall be accessible without hazard. Correction Verification: Submit Documentation 5 CSR 25-500.092 Furniture, Equipment and Materials Violation: The facility did not meet requirements for music and rhythm activities. The facility needed an additional 16 items in this category. Rule Reference: 5 CSR 25-500.092 Furniture, Equipment and Materials (2) (B) 2. F. states: Music and rhythm activities; Correction Required: The facility shall provide appropriate equipment for children as required. Correction Verification: Submit Documentation 5 CSR 25-500.102 Personnel Violation: A facility orientation was not conducted for a caregiver(s) before being left alone with children. The following staff need a facility orientation: Anthony Benson, Kendra Cook, Meagan Bonds, Vincent Williams, Kanyria Spears. Rule Reference: 5 CSR 25-500.102 Personnel (1) (K) . states: The child care provider shall ensure that within seven (7) days of employment or volunteering, and before being left alone with children, that caregivers employed on or after August 30, 2019, receive a facility orientation. The facility orientation shall include-- Correction Required: The facility shall ensure that a facility orientation occurs within 7 days of employment or volunteering and before caregivers are left alone with children. Correction Verification: Submit Documentation |
||
| 2024-05-15 | COMPLIANCE VERIFICATION | 12 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The requirements for protective outlet covers or twist-lock outlets were not met as evidenced by electrical outlets were not covered in that one electrical outlet in the preschool room, two in the infant/toddler unit and three outlets in the school age room were observed uncovered. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (G) states: Protective outlet covers or twist-lock outlets shall be used in areas accessible to the children. Correction Required: The facility shall use outlet covers or twist-lock outlets as required. Correction Verification: Submit Documentation Compliance Date: 2/21/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located basement was/were not in good condition as evidenced by the door to the boys restroom was broken and in need of repair. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 4/17/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The ceilings located in the girls restroom, in the basement was/were not in good condition as evidenced by the vent cover was loose and not fully attached to the ceiling. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 5/14/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located basement area under the steps was/were not in good condition as evidenced by the door was not attached to the closet. . Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 5/14/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located in the infant/toddler unit was/were not in good condition as evidenced by a hole approximately 2 inches wide was observed in the wall. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 2/21/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility did not have a fenced outdoor play area that was on or adjoining the day care property and was accessible without hazard as evidenced by the fence had openings large enough for a child to crawl or fall through - the openings measured approximately 12 inches in width and 3 feet in length. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 1. states: A fenced outdoor play area shall be available on or adjoining the day care property. The play area shall be located so it is convenient and the children can gain access to it without hazard. For facilities initially licensed after the effective date of these rules or for the installation of new fences in existing facilities, the fence shall be at least forty-two inches (42") high. An outdoor play area used exclusively for school-age children shall not be required to have a fence. Fences shall be constructed to prevent children from crawling or falling through or becoming entrapped. Correction Required: The outdoor play area shall be accessible without hazard. Correction Verification: Submit Documentation Compliance Date: 4/18/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Bathroom supplies were not available and accessible to children as evidenced by paper towels were not within children's reach. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (3) (A) 4. states: Paper towels, soap and toilet paper shall be provided and easily accessible so the children can reach them without assistance. Correction Required: The facility shall provide paper towels, soap and toilet paper, accessible for children's use. Correction Verification: Submit Documentation Compliance Date: 4/17/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The bathroom was not clean and odor free as evidenced by the toilet was soiled. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (3) (A) 7. states: Bathrooms shall be clean and odor free. Correction Required: Bathrooms shall be clean and odor free. Correction Verification: Submit Documentation Compliance Date: 4/17/2024 5 CSR 25-500.092 Furniture, Equipment and Materials Violation: Furniture/equipment, chairs, in the school age room was not in good condition as evidenced by chipped paint was observed on the legs of the chairs . Rule Reference: 5 CSR 25-500.092 Furniture, Equipment and Materials (1) (A) 1. states: All furniture and equipment shall be constructed safely, in good condition and free of sharp, loose or pointed parts. Only lead-free paint shall be used. Correction Required: The facility shall provide safe and clean furniture/equipment as required. Correction Verification: Submit Documentation Compliance Date: 3/12/2024 5 CSR 25-500.102 Personnel Violation: A caregiver did not obtain one clock hour of training for each month of employment. The staff listed need the following information: Tinika Lewis needs 3 clock hours, Monay Ware needs one clock hour and Sonia Womack needs 12 clock hours for 2023. Rule Reference: 5 CSR 25-500.102 Personnel (3) (C) states: Caregivers who were employed after the first of the year shall obtain one (1) clock of hour training for each one (1) month of employment, regardless of the date employment began. Correction Required: Required training hours shall be documented for each employee. Correction Verification: Submit Documentation Compliance Date: 4/16/2024 5 CSR 25-500.102 Personnel Violation: The requirements for obtaining 12 clock hours each calendar year were not met. For the calendar year of 2023, the staff listed need the following information: Susie Galloway needs 1.50 clock hours . Rule Reference: 5 CSR 25-500.102 Personnel (3) (A) states: The center director, group child care home provider, all other caregivers, and those volunteers who are counted in staff/child ratios shall obtain at least twelve (12) clock hours of child-care related training during each calendar year. Clock hour training shall be approved by the department. Correction Required: Required training hours shall be documented for each caregiver. Correction Verification: Submit Documentation Compliance Date: 3/12/2024 5 CSR 25-500.102 Personnel Violation: Safe sleep training was not completed within the past 3 years for the following staff Deondre Russell. Rule Reference: 5 CSR 25-500.102 Personnel (4) (A) . states: Every three (3) years, the child care provider, group child care home provider, child care staff members, and volunteers in a group child care home or child care center licensed to provide care for infants less than one (1) year of age shall successfully complete department-approved training regarding the American Academy of Pediatrics (AAP) safe sleep recommendations contained in the American Academy of Pediatrics Policy Statement on sleep-related infant deaths. The Sleep-Related Infant Deaths: Updated 2022 Recommendations for Reducing Infant Deaths in the Sleep Environment, July 2022, is incorporated by reference in this rule, as published by the American Academy of Pediatrics and available at https://publications.aap.org/pediatrics/article/150/1/e2022057990/188304/Sleep-Related-Infant-Deaths-Updated-2022 or as published in PEDIATRICS Volume 150, Issue 1, July 2022. A copy can also be obtained from the Department of Elementary and Secondary Education, Office of Childhood, 205 Jefferson Street, PO Box 480, Jefferson City, MO 65102-0480 and at https://dese.mo.gov/governmental-affairs/deseadministrativerules/incorporated-reference-materials. This rule does not incorporate any subsequent amendments or additions. Correction Required: The director, group home provider, other caregivers, and those volunteers counted in staff/child ratio, shall complete department-approved safe sleep training as required. Correction Verification: Submit Documentation Compliance Date: 2/28/2024 |
||
| 2024-02-20 | COMPLIANCE MONITORING | 13 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Children were not restricted to approved space as evidenced by the utility closet, in the basement, was observed unlocked. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (C) states: Children shall have no access to areas not approved for child care. Correction Required: Caregivers shall restrict children to approved space. Correction Verification: Corrected on Site Compliance Date: 2/20/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The requirements for protective outlet covers or twist-lock outlets were not met as evidenced by electrical outlets were not covered in that one electrical outlet in the preschool room, two in the infant/toddler unit and three outlets in the school age room were observed uncovered. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (G) states: Protective outlet covers or twist-lock outlets shall be used in areas accessible to the children. Correction Required: The facility shall use outlet covers or twist-lock outlets as required. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located in the infant/toddler unit was/were not in good condition as evidenced by a hole approximately 2 inches wide was observed in the wall. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility did not have a fenced outdoor play area that was on or adjoining the day care property and was accessible without hazard as evidenced by the fence had openings large enough for a child to crawl or fall through - the openings measured approximately 12 inches in width and 3 feet in length. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 1. states: A fenced outdoor play area shall be available on or adjoining the day care property. The play area shall be located so it is convenient and the children can gain access to it without hazard. For facilities initially licensed after the effective date of these rules or for the installation of new fences in existing facilities, the fence shall be at least forty-two inches (42") high. An outdoor play area used exclusively for school-age children shall not be required to have a fence. Fences shall be constructed to prevent children from crawling or falling through or becoming entrapped. Correction Required: The outdoor play area shall be accessible without hazard. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Bathroom supplies were not available and accessible to children as evidenced by paper towels were not within children's reach. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (3) (A) 4. states: Paper towels, soap and toilet paper shall be provided and easily accessible so the children can reach them without assistance. Correction Required: The facility shall provide paper towels, soap and toilet paper, accessible for children's use. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The bathroom was not clean and odor free as evidenced by the toilet was soiled. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (3) (A) 7. states: Bathrooms shall be clean and odor free. Correction Required: Bathrooms shall be clean and odor free. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located basement area under the steps was/were not in good condition as evidenced by the door was not attached to the closet. . Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The ceilings located in the girls restroom, in the basement was/were not in good condition as evidenced by the vent cover was loose and not fully attached to the ceiling. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located basement was/were not in good condition as evidenced by the door to the boys restroom was broken and in need of repair. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.092 Furniture, Equipment and Materials Violation: Furniture/equipment, chairs, in the school age room was not in good condition as evidenced by chipped paint was observed on the legs of the chairs . Rule Reference: 5 CSR 25-500.092 Furniture, Equipment and Materials (1) (A) 1. states: All furniture and equipment shall be constructed safely, in good condition and free of sharp, loose or pointed parts. Only lead-free paint shall be used. Correction Required: The facility shall provide safe and clean furniture/equipment as required. Correction Verification: Submit Documentation 5 CSR 25-500.102 Personnel Violation: Safe sleep training was not completed within the past 3 years for the following staff Deondre Russell. Rule Reference: 5 CSR 25-500.102 Personnel (4) (A) . states: Every three (3) years, the child care provider, group child care home provider, child care staff members, and volunteers in a group child care home or child care center licensed to provide care for infants less than one (1) year of age shall successfully complete department-approved training regarding the American Academy of Pediatrics (AAP) safe sleep recommendations contained in the American Academy of Pediatrics Policy Statement on sleep-related infant deaths. The Sleep-Related Infant Deaths: Updated 2022 Recommendations for Reducing Infant Deaths in the Sleep Environment, July 2022, is incorporated by reference in this rule, as published by the American Academy of Pediatrics and available at https://publications.aap.org/pediatrics/article/150/1/e2022057990/188304/Sleep-Related-Infant-Deaths-Updated-2022 or as published in PEDIATRICS Volume 150, Issue 1, July 2022. A copy can also be obtained from the Department of Elementary and Secondary Education, Office of Childhood, 205 Jefferson Street, PO Box 480, Jefferson City, MO 65102-0480 and at https://dese.mo.gov/governmental-affairs/deseadministrativerules/incorporated-reference-materials. This rule does not incorporate any subsequent amendments or additions. Correction Required: The director, group home provider, other caregivers, and those volunteers counted in staff/child ratio, shall complete department-approved safe sleep training as required. Correction Verification: Submit Documentation 5 CSR 25-500.102 Personnel Violation: A caregiver did not obtain one clock hour of training for each month of employment. The staff listed need the following information: Tinika Lewis needs 3 clock hours, Monay Ware needs one clock hour and Sonia Womack needs 12 clock hours for 2023. Rule Reference: 5 CSR 25-500.102 Personnel (3) (C) states: Caregivers who were employed after the first of the year shall obtain one (1) clock of hour training for each one (1) month of employment, regardless of the date employment began. Correction Required: Required training hours shall be documented for each employee. Correction Verification: Submit Documentation 5 CSR 25-500.102 Personnel Violation: The requirements for obtaining 12 clock hours each calendar year were not met. For the calendar year of 2023, the staff listed need the following information: Susie Galloway needs 1.50 clock hours . Rule Reference: 5 CSR 25-500.102 Personnel (3) (A) states: The center director, group child care home provider, all other caregivers, and those volunteers who are counted in staff/child ratios shall obtain at least twelve (12) clock hours of child-care related training during each calendar year. Clock hour training shall be approved by the department. Correction Required: Required training hours shall be documented for each caregiver. Correction Verification: Submit Documentation |
||
| 2023-09-27 | COMPLIANCE VERIFICATION | 3 violations cited |
|
Findings: 5 CSR 25-500.052 Annual Requirements Violation: The Family Care Safety Registry check was not conducted for Janyia Osby within thirty (30) days prior to the anniversary date. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (C) states: The child care provider shall conduct a Family Care Safety Registry check for all child care staff members within thirty (30) days prior to the anniversary date as printed on the license. Correction Required: Required Family Care Safety Registry checks shall be conducted for all child care staff member(s) within thirty (30) days prior to the anniversary date. Correction Verification: Submit Documentation Compliance Date: 9/1/2023 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located in the School Age restrooms was/were not clean as evidenced by trash/debris and dirt was observed on the surface of the area. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 9/5/2023 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The bathroom was not clean and odor free as evidenced by the toilet was soiled. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (3) (A) 7. states: Bathrooms shall be clean and odor free. Correction Required: Bathrooms shall be clean and odor free. Correction Verification: Submit Documentation Compliance Date: 9/5/2023 |
||
| 2023-08-31 | COMPLIANCE MONITORING | |
| 2023-06-27 | COMPLIANCE VERIFICATION | |
| 2023-05-17 | REINSPECTION | |
| 2023-02-16 | COMPLIANCE MONITORING | |
| 2022-09-19 | REINSPECTION | |
| 2022-08-23 | COMPLIANCE MONITORING | |
| 2022-05-19 | COMPLIANCE VERIFICATION | |
| 2022-04-14 | REINSPECTION | |
| 2022-04-05 | SUPPLEMENTAL | |
| 2022-02-23 | COMPLIANCE MONITORING | |
| 2022-01-11 | COMPLAINT INVESTIGATION | |
If you are a provider and believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Providers in ZIP Code 63113
Looking for Child Care?