Kiddos Korner Llc
Quick Facts
Missing details such as transportation or rates? Suggest an update to help other families.
Reviews
Write a Review
Be the first to review this childcare provider. Write a review about Kiddos Korner Llc. Let other families know what's great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.
About the Provider
Hours of Operation
- Monday6:00 AM- 9:00 PM
- Tuesday6:00 AM- 9:00 PM
- Wednesday6:00 AM- 9:00 PM
- Thursday6:00 AM- 9:00 PM
- Friday6:00 AM- 9:00 PM
- Saturday Closed
- Sunday Closed
Inspection/Report History
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns. Reports can also be verified with your local daycare licensing office.
| Report Date | Report Type | Violations |
|---|---|---|
| 2026-07-10 | COMPLIANCE MONITORING | No violations cited |
| 2026-02-17 | COMPLIANCE VERIFICATION | 1 violation cited |
|
Findings: 5 CSR 25-500.052 Annual Requirements Violation: The annual fire safety inspection was not approved. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (A) states: Evidence of compliance with a fire and safety inspection as conducted by the State Fire Marshal or his/her designee. Correction Required: The facility shall submit evidence of compliance with annual fire safety requirements. Correction Verification: Submit Documentation Compliance Date: 2/17/2026 |
||
| 2026-02-06 | COMPLIANCE MONITORING | 4 violations cited |
|
Findings: 5 CSR 25-500.052 Annual Requirements Violation: The annual fire safety inspection was not approved. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (A) states: Evidence of compliance with a fire and safety inspection as conducted by the State Fire Marshal or his/her designee. Correction Required: The facility shall submit evidence of compliance with annual fire safety requirements. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility did not have a fenced outdoor play area that was on or adjoining the day care property and was accessible without hazard as evidenced by the fence was not in good condition in that during the outdoor inspection, the fence was missing a anchor bar in the fence that was allowing the back fence (school age playground side) to not anchor or lock properly. When CI Ray-Warnke went to attempt to anchor the bar or latch the fence there was a lock engaged but no bar. Since there is no bar to engage at the bottom of the fence this create a hazard for when school age children exit their exit doors into the playground, children have nothing to precent them from exiting the property and fence of the facility into unapproved outdoor space and neighboring property. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 1. states: A fenced outdoor play area shall be available on or adjoining the day care property. The play area shall be located so it is convenient and the children can gain access to it without hazard. For facilities initially licensed after the effective date of these rules or for the installation of new fences in existing facilities, the fence shall be at least forty-two inches (42") high. An outdoor play area used exclusively for school-age children shall not be required to have a fence. Fences shall be constructed to prevent children from crawling or falling through or becoming entrapped. Correction Required: The outdoor play area shall be accessible without hazard. Correction Verification: Corrected on Site Compliance Date: 2/6/2026 5 CSR 25-500.222 Records and Reports Violation: 1 child(ren) records did not include work schedule of parent(s), guardian or legal custodian. Rule Reference: 5 CSR 25-500.222 Records and Reports (2) (B) states: Full name of the parent(s), guardian or legal custodian, home address, employers' name and address, work schedule, and home and work telephone numbers; Correction Required: Child enrollment information shall be completed and on file as required. Correction Verification: Corrected on Site Compliance Date: 2/6/2026 5 CSR 25-500.222 Records and Reports Violation: 1 child(ren) records did not include work telephone number of parent(s), guardian or legal custodian. Rule Reference: 5 CSR 25-500.222 Records and Reports (2) (B) states: Full name of the parent(s), guardian or legal custodian, home address, employers' name and address, work schedule, and home and work telephone numbers; Correction Required: Child enrollment information shall be completed and on file as required. Correction Verification: Corrected on Site Compliance Date: 2/6/2026 |
||
| 2025-08-13 | COMPLIANCE MONITORING | 3 violations cited |
|
Findings: 5 CSR 25-500.052 Annual Requirements Violation: The annual fire safety inspection was not approved. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (A) states: Evidence of compliance with a fire and safety inspection as conducted by the State Fire Marshal or his/her designee. Correction Required: The facility shall submit evidence of compliance with annual fire safety requirements. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located in the school age room was/were not in good condition as evidenced by the intake vent on the wall has a protective door that prevents access to the vent filter. The door was not adhered to the wall and was open and swinging back and forth. The door open allowed children access to the intake vent and filter. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Corrected on Site Compliance Date: 8/13/2025 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: There was evidence of dirt/debris in the freshman school age room. The intake vent was dusty and appeared dark brown from the exterior. The dirt and dust is accessible to children. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 9. states: The facility shall be clean at all times and free of dirt, insects, spiders, rodents or other pests. Correction Required: The facility shall be clean and pest free. Correction Verification: Corrected on Site Compliance Date: 8/13/2025 |
||
| 2025-05-28 | SUPPLEMENTAL | 4 violations cited |
|
Findings: 5 CSR 25-500.052 Annual Requirements Violation: The annual fire safety inspection was not approved. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (A) states: Evidence of compliance with a fire and safety inspection as conducted by the State Fire Marshal or his/her designee. Correction Required: The facility shall submit evidence of compliance with annual fire safety requirements. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located School Age Room was/were not in good condition as evidenced by the floor seems to be slopping down or sinking as you enter the classroom along the entire left hand side of the classroom. This sinking/slope is seperating the tile. There is a long line/seperation of the floor tile along the entire left side of the classroom. The tile is not smooth in areas for the floor is also uneven, there are small bumps and slopes in the floor. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 3/6/2025 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located 4's & 5's Room was/were not in good condition as evidenced by tile is missing on the floor by the teacher's desk. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 3/6/2025 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located Juniors Room was/were not in good condition as evidenced by the tile is missing and is chipping by the emergency exit door. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 3/6/2025 |
||
| 2025-02-07 | COMPLIANCE MONITORING | 9 violations cited |
|
Findings: 5 CSR 25-500.052 Annual Requirements Violation: The annual fire safety inspection was not approved. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (A) states: Evidence of compliance with a fire and safety inspection as conducted by the State Fire Marshal or his/her designee. Correction Required: The facility shall submit evidence of compliance with annual fire safety requirements. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located School Age Room was/were not in good condition as evidenced by the floor seems to be slopping down or sinking as you enter the classroom along the entire left hand side of the classroom. This sinking/slope is seperating the tile. There is a long line/seperation of the floor tile along the entire left side of the classroom. The tile is not smooth in areas for the floor is also uneven, there are small bumps and slopes in the floor. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located 4's & 5's Room was/were not in good condition as evidenced by tile is missing on the floor by the teacher's desk. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located Juniors Room was/were not in good condition as evidenced by there is a whole in the wall located on the floor in the corner next to the art area. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 2/7/2025 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located Freshman Room was/were not in good condition as evidenced by there is a 3 inch by 1 inch hole that is about 3 inches deep, where the tile is missing and the foundation of the building is exposed to the right of the intake vent. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation Compliance Date: 2/7/2025 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located Juniors Room was/were not in good condition as evidenced by the tile is missing and is chipping by the emergency exit door. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Hazardous items as follows were accessible to children: the inside right corner of the intake vent. The item(s) was/were located in the Junior room. The intake vent is not adhered properly and is missing a fastener in the right hand top corner of the vent. Children have access to the filter and vent. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (I) states: All flammable liquids, matches, cleaning supplies, poisonous materials, medicines, alcoholic beverages, hazardous personal care items or other hazardous items shall be inaccessible to children. Correction Required: Hazardous items shall be inaccessible to children. Correction Verification: Submit Documentation Compliance Date: 2/7/2025 5 CSR 25-500.222 Records and Reports Violation: 1 child(ren) records did not include work telephone number of parent(s), guardian or legal custodian. Rule Reference: 5 CSR 25-500.222 Records and Reports (2) (B) states: Full name of the parent(s), guardian or legal custodian, home address, employers' name and address, work schedule, and home and work telephone numbers; Correction Required: Child enrollment information shall be completed and on file as required. Correction Verification: Corrected on Site Compliance Date: 2/7/2025 5 CSR 25-500.222 Records and Reports Violation: 1 child(ren) records did not include address of another individual who might be reached in an emergency. Rule Reference: 5 CSR 25-500.222 Records and Reports (2) (C) states: Name, address and telephone number of another individual (friend or relative) who might be reached in an emergency when the parent(s), guardian or legal custodian cannot be reached; Correction Required: Child enrollment information shall be completed and on file as required. Correction Verification: Corrected on Site Compliance Date: 2/7/2025 |
||
| 2024-11-21 | SUPPLEMENTAL | 6 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located Juniors Room was/were not in good condition as evidenced by the tile is missing and is chipping by the emergency exit door. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located Freshman Room was/were not in good condition as evidenced by there is a 3 inch by 1 inch hole that is about 3 inches deep, where the tile is missing and the foundation of the building is exposed to the right of the intake vent. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located Juniors Room was/were not in good condition as evidenced by there is a whole in the wall located on the floor in the corner next to the art area. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located 4's & 5's Room was/were not in good condition as evidenced by tile is missing on the floor by the teacher's desk. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located School Age Room was/were not in good condition as evidenced by the floor seems to be slopping down or sinking as you enter the classroom along the entire left hand side of the classroom. This sinking/slope is seperating the tile. There is a long line/seperation of the floor tile along the entire left side of the classroom. The tile is not smooth in areas for the floor is also uneven, there are small bumps and slopes in the floor. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Hazardous items as follows were accessible to children: the inside right corner of the intake vent. The item(s) was/were located in the Junior room. The intake vent is not adhered properly and is missing a fastener in the right hand top corner of the vent. Children have access to the filter and vent. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (I) states: All flammable liquids, matches, cleaning supplies, poisonous materials, medicines, alcoholic beverages, hazardous personal care items or other hazardous items shall be inaccessible to children. Correction Required: Hazardous items shall be inaccessible to children. Correction Verification: Submit Documentation |
||
| 2024-08-16 | COMPLIANCE MONITORING | 6 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located School Age Room was/were not in good condition as evidenced by the floor seems to be slopping down or sinking as you enter the classroom along the entire left hand side of the classroom. This sinking/slope is seperating the tile. There is a long line/seperation of the floor tile along the entire left side of the classroom. The tile is not smooth in areas for the floor is also uneven, there are small bumps and slopes in the floor. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located 4's & 5's Room was/were not in good condition as evidenced by tile is missing on the floor by the teacher's desk. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The walls located Juniors Room was/were not in good condition as evidenced by there is a whole in the wall located on the floor in the corner next to the art area. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located Freshman Room was/were not in good condition as evidenced by there is a 3 inch by 1 inch hole that is about 3 inches deep, where the tile is missing and the foundation of the building is exposed to the right of the intake vent. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The floors located Juniors Room was/were not in good condition as evidenced by the tile is missing and is chipping by the emergency exit door. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required: Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Hazardous items as follows were accessible to children: the inside right corner of the intake vent. The item(s) was/were located in the Junior room. The intake vent is not adhered properly and is missing a fastener in the right hand top corner of the vent. Children have access to the filter and vent. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (I) states: All flammable liquids, matches, cleaning supplies, poisonous materials, medicines, alcoholic beverages, hazardous personal care items or other hazardous items shall be inaccessible to children. Correction Required: Hazardous items shall be inaccessible to children. Correction Verification: Submit Documentation |
||
| 2024-04-23 | COMPLIANCE VERIFICATION | 3 violations cited |
|
Findings: 5 CSR 25-500.052 Annual Requirements Violation: The facility is owned by a legal entity and evidence of good standing was not available. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (D) states: Documentation as required by the Missouri Secretary of State and state law to verify the legal entity is in good standing, if a group child care home or child care center is owned by a legal entity. Correction Required: The facility shall submit evidence that the legal entity is in good standing with the Missouri Secretary of State and state law. Correction Verification: Submit Documentation Compliance Date: 2/14/2024 5 CSR 25-500.052 Annual Requirements Violation: The annual fire safety inspection was not approved. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (A) states: Evidence of compliance with a fire and safety inspection as conducted by the State Fire Marshal or his/her designee. Correction Required: The facility shall submit evidence of compliance with annual fire safety requirements. Correction Verification: Submit Documentation Compliance Date: 4/23/2024 5 CSR 25-500.102 Personnel Violation: The requirements for obtaining 12 clock hours each calendar year were not met. For the calendar year of 2023, the staff listed need the following information: Makalyn Horn will need 1 hour, Erica Reimund will need 2 hours and Alyssa Wilken will need 2 hours. Rule Reference: 5 CSR 25-500.102 Personnel (3) (A) states: The center director, group child care home provider, all other caregivers, and those volunteers who are counted in staff/child ratios shall obtain at least twelve (12) clock hours of child-care related training during each calendar year. Clock hour training shall be approved by the department. Correction Required: Required training hours shall be documented for each caregiver. Correction Verification: Submit Documentation Compliance Date: 4/23/2024 |
||
| 2024-02-09 | COMPLIANCE MONITORING | 4 violations cited |
|
Findings: 5 CSR 25-500.052 Annual Requirements Violation: The facility is owned by a legal entity and evidence of good standing was not available. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (D) states: Documentation as required by the Missouri Secretary of State and state law to verify the legal entity is in good standing, if a group child care home or child care center is owned by a legal entity. Correction Required: The facility shall submit evidence that the legal entity is in good standing with the Missouri Secretary of State and state law. Correction Verification: Submit Documentation 5 CSR 25-500.052 Annual Requirements Violation: The annual fire safety inspection was not approved. Rule Reference: 5 CSR 25-500.052 Annual Requirements (2) (A) states: Evidence of compliance with a fire and safety inspection as conducted by the State Fire Marshal or his/her designee. Correction Required: The facility shall submit evidence of compliance with annual fire safety requirements. Correction Verification: Submit Documentation 5 CSR 25-500.052 Annual Requirements Violation: The Annual Declaration was not submitted. Rule Reference: 5 CSR 25-500.052 Annual Requirements (1) (A) states: An Annual Declaration for Licensed Facility form, revised 2021 and incorporated by reference in this rule. As published by the Missouri Department of Elementary and Secondary Education, PO Box 480, Jefferson City, MO 65102-0480 and available by the department at https://dese.mo.gov/childhood/forms, indicating the licensee’s intent to continue operating a licensed group child care home or child care center and agreement to comply with all statutes and department licensing rules. Correction Required: The facility shall submit the Annual Declaration as required. Correction Verification: Corrected on Site Compliance Date: 2/9/2024 5 CSR 25-500.102 Personnel Violation: The requirements for obtaining 12 clock hours each calendar year were not met. For the calendar year of 2023, the staff listed need the following information: Makalyn Horn will need 1 hour, Erica Reimund will need 2 hours and Alyssa Wilken will need 2 hours. Rule Reference: 5 CSR 25-500.102 Personnel (3) (A) states: The center director, group child care home provider, all other caregivers, and those volunteers who are counted in staff/child ratios shall obtain at least twelve (12) clock hours of child-care related training during each calendar year. Clock hour training shall be approved by the department. Correction Required: Required training hours shall be documented for each caregiver. Correction Verification: Submit Documentation |
||
| 2023-08-14 | COMPLIANCE MONITORING | |
| 2023-02-24 | COMPLIANCE VERIFICATION | |
| 2023-02-01 | COMPLIANCE MONITORING | |
| 2022-08-15 | COMPLIANCE MONITORING | |
| 2022-02-28 | COMPLIANCE VERIFICATION | |
| 2022-02-22 | COMPLIANCE MONITORING | |
If you are a provider and believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Providers in ZIP Code 63090
Looking for Child Care?