Description: CDI Head Start- Spiro is a Child Care Center in SPIRO OK, with a maximum capacity of 60 children. This child care center helps with children in the age range of 3 Years, 4 Years, 5 Years. The provider does not participate in a subsidized child care program.
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable, but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns, as the provider may have already addressed some or all issues. Reports can also be verified with your local daycare licensing office.
Date | Type/Purpose | Corrections |
---|---|---|
2020-09-28 | Permit Full Inspection |
|
Description: No non-compliances observed | ||
2020-07-28 | Other Partial Inspection |
Plan: The tree is supposed to be removed today (7-28-20) from the play yard. Ms. Baxter will provide Licensing Specialist verification that the tree is gone. Correction Date: 2020-07-31 |
Description:
340:110-3-303(a) - General. Hazards mean anything that may inflict injury or cause harm.
There is a downed tree on the outdoor play area. |
||
2020-07-28 | Other Partial Inspection |
Plan: The school has ordered impact material (mulch) & it should be delivered today. Ms. Baxter will provide licensing specialist verification that the mulch has been dispersed and measures at least 6 inches deep. Correction Date: 2020-07-31 |
Description:
340:110-3-301(c)(11)(A)(ii) - swings;
There is no impact material under the swings. |
||
2020-07-28 | Other Partial Inspection |
Plan: The school has ordered impact material (mulch) & it should be delivered today. Ms. Baxter will provide Licensing Specialist verification that the mulch has been dispersed & measures at least 6 inches deep under the slides & climbing equipment. Correction Date: 2020-07-31 |
Description:
340:110-3-301(c)(11)(B)(i)(I) - are maintained at a depth of at least six inches by replacing, leveling, or raking. In addition, rubber mulch, EWF, and any other loose-fill material that is tested by the American Society for Testing and Materials International (ASTM) must comply with ASTM impact attenuation and EWF guidelines;
Impact material is less than 6 inches. |
||
2020-07-28 | Other Partial Inspection |
Plan: Director, Penny Baxter will complete a new Equipment Inventory which she has been provided. Ms. Baxter will email Licensing Specialist a copy of the new Equipment Inventory. Correction Date: 2020-07-31 |
Description:
340:110-3-302(a)(3)(B) - conducts an equipment inventory at least every 12 months. Documentation is maintained per OAC 340:110-3-281.2(c).
Program has not completed an Equipment Inventory for the new location. |
||
2020-07-28 | Other Partial Inspection |
Plan: Director, Penny Baxter was provided a copy of the Physical Environment Checklist. Ms. Baxter reported she should have it completed by 7-29-20. Ms. Baxter agreed to email Licensing Specialist a copy of the new Physical Environment Checklist. Correction Date: 2020-07-31 |
Description:
340:110-3-281.2(c)(9)(A) - Physical environment checklist. DHS form, or other checklists regarding the same information as the form, is completed at least every 12 months.
PROGRAM HAS NOT COMPLETED A PHYSICAL ENVIRONMENT CHECKLIST FOR THE NEW PROGRAM. |
||
2020-02-11 | Permit Full Inspection |
|
Description: No non-compliances observed | ||
2019-12-27 | Application Full Inspection |
Plan: Program will replace impact material under small metal slide. Program will rake impact material under large climber with slide. If impact does not measure at least 6 inches, Program will add more impact material. Correction Date: 2020-01-03 |
Description:
340:110-3-301(c)(11)(B)(i)(I) - are maintained at a depth of at least six inches by replacing, leveling, or raking. In addition, rubber mulch, EWF, and any other loose-fill material that is tested by the American Society for Testing and Materials International (ASTM) must comply with ASTM impact attenuation and EWF guidelines;
Impact material is less than 6 inches under the slides. |
||
2019-12-27 | Application Full Inspection |
Plan: A copy of the Program's Liability Insurance policy will be emailed to Regional Program Manager, Kelly L. Harrison ([email protected]) once it's available. Correction Date: 2020-01-03 |
Description:
340:110-3-278(b) - Program liability insurance policy. Program liability insurance is maintained, unless an exception, per Section 404.3 of Title 10 of the Oklahoma Statutes, Oklahoma Child Care Facilities Licensing Act, is posted per OAC 340:110-3-281.1.
Program will have Liability Insurance but the Policy was not available. |
If you are a provider and you believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Be the first to review this childcare provider. Write a review about CDI Head Start- Spiro. Let other families know what’s great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.
Connect, Seek Advice, Share Knowledge