North Central Missouri College
Quick Facts
Missing details such as transportation or rates? Suggest an update to help other families.
Contact Information
📞 (660) 947-3526Reviews
Write a Review
Be the first to review this childcare provider. Write a review about North Central Missouri College. Let other families know what's great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.
About the Provider
Hours of Operation
- Monday6:00 AM- 9:00 PM
- Tuesday6:00 AM- 9:00 PM
- Wednesday6:00 AM- 9:00 PM
- Thursday6:00 AM- 9:00 PM
- Friday6:00 AM- 9:00 PM
- Saturday Closed
- Sunday Closed
Inspection/Report History
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns. Reports can also be verified with your local daycare licensing office.
| Report Date | Report Type | Violations |
|---|---|---|
| 2026-08-25 | COMPLIANCE MONITORING | 4 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Window and door requirements were not met as evidenced by the screen was not in good repair in that the window on the door was broken and the safety glass was shattered and still in the door. The facility is not using the door at this time.. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 2. states: Open windows and doors shall be screened securely. Barriers to prevent children from falling against windows or falling from windows shall be provided when windows are less than twenty-four inches (24") from the floor and not constructed of safety glass or other nonbreakable material. Correction Required: Open windows and doors shall be screened securely and barriers shall be installed as required. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: There was evidence of dirt/debris in under the pad of the changing table in the two year old room.. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 9. states: The facility shall be clean at all times and free of dirt, insects, spiders, rodents or other pests. Correction Required: The facility shall be clean and pest free. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility did not have a fenced outdoor play area that was on or adjoining the day care property and was accessible without hazard as evidenced by the fence had openings that were between 3.5 and 9 inches and allow entrapment - the openings measured the double gate on the preschool play area needs to be secured and the space between the fencing to be less than 3.5 inches.. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 1. states: A fenced outdoor play area shall be available on or adjoining the day care property. The play area shall be located so it is convenient and the children can gain access to it without hazard. For facilities initially licensed after the effective date of these rules or for the installation of new fences in existing facilities, the fence shall be at least forty-two inches (42") high. An outdoor play area used exclusively for school-age children shall not be required to have a fence. Fences shall be constructed to prevent children from crawling or falling through or becoming entrapped. Correction Required: The outdoor play area shall be accessible without hazard. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility's outdoor space was not safe for children's activities as evidenced by grass is covering several of the outdoor toys that the infant/toddlers are playing on.. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 4. states: The play area shall be safe for children's activities, well-maintained, free of hazards such as poisonous plants, broken glass, rocks or other debris and shall have good drainage. Correction Required: The outdoor play area shall be clean, safe and well-maintained as required. Correction Verification: Submit Documentation |
||
| 2026-08-06 | SUPPLEMENTAL | No violations cited |
| 2026-04-10 | COMPLAINT INVESTIGATION | |
| 2026-02-10 | COMPLIANCE MONITORING | 1 violation cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: Hazardous items as follows were accessible to children: hand sanitizer and bleach/water sanitizer spray. The item(s) was/were located on a shelf low enough for the children to reach and had access to items. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (1) (I) states: All flammable liquids, matches, cleaning supplies, poisonous materials, medicines, alcoholic beverages, hazardous personal care items or other hazardous items shall be inaccessible to children. Correction Required: Hazardous items shall be inaccessible to children. Correction Verification: Corrected on Site Compliance Date: 2/10/2026 |
||
| 2025-08-21 | COMPLIANCE MONITORING | No violations cited |
| 2025-01-23 | COMPLIANCE MONITORING | No violations cited |
| 2024-11-20 | COMPLIANCE VERIFICATION | 5 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility's outdoor space was not safe for children's activities as evidenced by the playground is under construction and has no resilient material.. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 4. states: The play area shall be safe for children's activities, well-maintained, free of hazards such as poisonous plants, broken glass, rocks or other debris and shall have good drainage. Correction Required: The outdoor play area shall be clean, safe and well-maintained as required. Correction Verification: Submit Documentation Compliance Date: 11/20/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The fall-zone area under and around outdoor equipment where children might fall and be injured was not covered with impact-absorbing materials to cushion a fall as evidenced by no resilient material was present. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 5. states: The fall-zone area under and around outdoor equipment where children might fall and be injured shall be covered with impact absorbing materials which will effectively cushion the fall of a child. This material may include sand, pea gravel, tanbark, shredded tires, wood chips, rubber matting or other approved resilient material. Correction Required: The facility shall maintain approved resilient material in all fall-zone areas. Correction Verification: Submit Documentation Compliance Date: 11/20/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The provider did not provide resilient material necessary for the protection of children as evidenced by the playground is currently under construction and is all dirt.. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 6. states: The provider shall be responsible for the type, depth and fall-zone area of resilient material necessary for the protection of children. Correction Required: Appropriate type, depth and fall zone area of resilient material shall be provided for the protection of children. Correction Verification: Submit Documentation Compliance Date: 11/20/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The fall-zone area under and around outdoor equipment where children might fall and be injured was not covered with impact-absorbing materials to cushion a fall as evidenced by resilient material was not uniformly spread over the fall-zone area. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 7. states: Areas under and around outdoor equipment shall have continuous maintenance to ensure that the material remains in place and retains its cushioning properties. The resilient material shall be supplemented immediately or replaced as needed. Correction Required: The facility shall maintain approved resilient material in all fall-zone areas. Correction Verification: Submit Documentation Compliance Date: 11/20/2024 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The observed surface area under entire play area, from which a child might fall consists of bare soil. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 8. states: Concrete, asphalt, carpet, grass or bare soil is not an acceptable surface under outdoor equipment from which children might fall and be injured. Correction Required: The facility shall not use concrete, asphalt, carpet, grass or bare soil under equipment from which a child might fall. Correction Verification: Submit Documentation Compliance Date: 11/20/2024 |
||
| 2024-08-23 | COMPLIANCE MONITORING | 5 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The facility's outdoor space was not safe for children's activities as evidenced by the playground is under construction and has no resilient material.. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 4. states: The play area shall be safe for children's activities, well-maintained, free of hazards such as poisonous plants, broken glass, rocks or other debris and shall have good drainage. Correction Required: The outdoor play area shall be clean, safe and well-maintained as required. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The fall-zone area under and around outdoor equipment where children might fall and be injured was not covered with impact-absorbing materials to cushion a fall as evidenced by no resilient material was present. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 5. states: The fall-zone area under and around outdoor equipment where children might fall and be injured shall be covered with impact absorbing materials which will effectively cushion the fall of a child. This material may include sand, pea gravel, tanbark, shredded tires, wood chips, rubber matting or other approved resilient material. Correction Required: The facility shall maintain approved resilient material in all fall-zone areas. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The provider did not provide resilient material necessary for the protection of children as evidenced by the playground is currently under construction and is all dirt.. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 6. states: The provider shall be responsible for the type, depth and fall-zone area of resilient material necessary for the protection of children. Correction Required: Appropriate type, depth and fall zone area of resilient material shall be provided for the protection of children. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The fall-zone area under and around outdoor equipment where children might fall and be injured was not covered with impact-absorbing materials to cushion a fall as evidenced by resilient material was not uniformly spread over the fall-zone area. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 7. states: Areas under and around outdoor equipment shall have continuous maintenance to ensure that the material remains in place and retains its cushioning properties. The resilient material shall be supplemented immediately or replaced as needed. Correction Required: The facility shall maintain approved resilient material in all fall-zone areas. Correction Verification: Submit Documentation 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The observed surface area under entire play area, from which a child might fall consists of bare soil. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 8. states: Concrete, asphalt, carpet, grass or bare soil is not an acceptable surface under outdoor equipment from which children might fall and be injured. Correction Required: The facility shall not use concrete, asphalt, carpet, grass or bare soil under equipment from which a child might fall. Correction Verification: Submit Documentation |
||
| 2024-07-09 | COMPLIANCE VERIFICATION | 2 violations cited |
|
Findings: 5 CSR 25-500.042 Licensing Process Violation: The sanitation inspection was not conducted. Rule Reference: 5 CSR 25-500.042 Licensing Process (4) (K) states: Evidence of compliance with local or state, or both, sanitation requirements. Correction Required: The facility shall submit evidence of compliance with sanitation requirements. Correction Verification: Submit Documentation Compliance Date: 4/18/2024 5 CSR 25-500.042 Licensing Process Violation: The fire safety inspection was not conducted. Rule Reference: 5 CSR 25-500.042 Licensing Process (5) states: Prior to the granting of a license, the provider shall meet the requirements of 5 CSR 25-500.087 Fire Safety. Correction Required: The facility shall submit evidence of compliance with fire safety requirements. Correction Verification: Submit Documentation Compliance Date: 4/10/2024 |
||
| 2024-04-03 | COMPLIANCE MONITORING | 2 violations cited |
|
Findings: 5 CSR 25-500.042 Licensing Process Violation: The fire safety inspection was not conducted. Rule Reference: 5 CSR 25-500.042 Licensing Process (5) states: Prior to the granting of a license, the provider shall meet the requirements of 5 CSR 25-500.087 Fire Safety. Correction Required: The facility shall submit evidence of compliance with fire safety requirements. Correction Verification: Submit Documentation 5 CSR 25-500.042 Licensing Process Violation: The sanitation inspection was not conducted. Rule Reference: 5 CSR 25-500.042 Licensing Process (4) (K) states: Evidence of compliance with local or state, or both, sanitation requirements. Correction Required: The facility shall submit evidence of compliance with sanitation requirements. Correction Verification: Submit Documentation |
||
| 2024-03-13 | COMPLIANCE MONITORING | No violations cited |
| 2023-08-18 | COMPLIANCE MONITORING | |
| 2023-02-14 | COMPLIANCE MONITORING | |
| 2022-06-21 | COMPLIANCE VERIFICATION | |
| 2022-04-08 | COMPLIANCE MONITORING | |
If you are a provider and believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Nearby Providers
Looking for Child Care?