Description: HUGO HEAD START 3 & 4 is a Child Care Center in HUGO OK, with a maximum capacity of 30 children. This child care center helps with children in the age range of 3 Years, 4 Years, 5 Years. The provider does not participate in a subsidized child care program.
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable, but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns, as the provider may have already addressed some or all issues. Reports can also be verified with your local daycare licensing office.
Date | Type/Purpose | Corrections |
---|---|---|
2021-09-07 | Periodic Full Inspection |
Plan: The current CDA Certificate for JA will be submitted to CECPD. In the future CDA certificates will be renewed and submitted in a timely manner. Correction Date: 2021-10-15 |
Description:
340:110-3-284.2(b) - Master teachers. The program employs or uses at least the minimum number of required individuals or volunteers meeting the position specific requirements in (1) through (6) of this subsection.
Program does not employ a qualified master teacher at this time. Teacher (JA) current PDL has dropped to a level 2. |
||
2021-03-10 | Periodic Full Inspection |
|
Description: No non-compliances observed | ||
2020-03-03 | Periodic Full Inspection |
|
Description: No non-compliances observed | ||
2019-09-04 | Periodic Full Inspection |
Plan: The program will maintain the Professional Development Registry; the registry will reflect the current personnel. Correction Date: 2019-09-18 |
Description:
340:110-3-284.1(b)(2)(B)(vii) - registering the program as a direct care organization and maintaining information on the Oklahoma Professional Development Registry (OPDR); and
Professional Development Registry is not being maintained. Staff that are no longer employed have to been removed. |
||
2019-03-06 | Periodic Full Inspection |
|
Description: No non-compliances observed | ||
2018-09-05 | Periodic Full Inspection |
|
Description: No non-compliances observed | ||
2018-03-07 | Periodic Full Inspection |
Plan: Program director states that she is working towards her CDA at this time. Correction Date: 2018-06-06 |
Description:
340:110-3-284.2(b)(1) - Required master teachers. At least one master teacher is required for every 60 children of the licensed capacity. Only the required number of master teachers are required to meet all of the master teacher requirements. However, all master teachers meet cardio-pulmonary (CPR) and first aid certification requirements listed in (5) of this subsection.
Program does not employ a qualified master teacher. |
||
2018-03-07 | Periodic Full Inspection |
Plan: Program will check the control panel on the central detection system monthly and document. The control panel was checked on this day and observed to be in working order. The date was documented on drill sheet. Correction Date: 2018-03-07 |
Description:
340:110-3-279(f)(2)(B) - checked at least monthly by viewing the control panel and documented per OAC 340:110-3-281.2(c). However, this is not required when a company continuously monitors the system for full-function as documented per OAC 340:110-3-281.2(c); and
Central detection has not been checked monthly. |
||
2017-09-05 | Periodic Full Inspection |
Plan: Program will obtain and maintain a qualified director. Correction Date: 2017-12-05 |
Description:
340:110-3-284.1(b) - Director. The program employs an individual who meets these position specific requirements.
The program does not employ a qualified director at this time. |
||
2017-09-05 | Periodic Full Inspection |
Plan: Program will obtain and maintain a qualified master teacher. Correction Date: 2017-12-05 |
Description:
340:110-3-284.2(b) - Master teachers. The program employs or uses at least the minimum number of required individuals or volunteers who meet these position specific requirements.
Program does not employ a master teacher. |
||
2017-09-05 | Periodic Full Inspection |
Plan: Smoke detectors will be checked and documented monthly. Correction Date: 2017-09-19 |
Description:
340:110-3-279(f)(2)(B) - checked at least monthly by viewing the control panel and documented per OAC 340:110-3-281.2(c). However, this is not required when a company continuously monitors the system for full-function as documented per OAC 340:110-3-281.2(c); and
Smoke detectors are not being checked monthly. |
||
2017-09-05 | Periodic Full Inspection |
Plan: Annual drills will be conducted annually and documented. Correction Date: 2017-09-19 |
Description:
340:110-3-279(g)(1)(C)(ii) - Annual. Annual drills include:
Annual drills have not been conducted. |
||
2017-03-06 | Periodic Full Inspection |
Plan: Program will complete the physical environment checklist every 12 months. Correction Date: 2017-03-13 |
Description:
340:110-3-281.2(c)(9)(A) - Physical environment checklist. DHS form, or other checklists regarding the same information as the form, is completed at least every 12 months.
Program did not have a physical environment checklist. |
||
2017-03-06 | Periodic Full Inspection |
Plan: Program will complete equipment inventory form. Correction Date: 2017-03-13 |
Description:
340:110-3-281.2(c)(9)(D) - Equipment inventory. DHS form applicable to the program type and ages of children accepted into care is available.
Program did not have a equipment inventory checklist. |
If you are a provider and you believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Be the first to review this childcare provider. Write a review about HUGO HEAD START 3 & 4. Let other families know what’s great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.
Connect, Seek Advice, Share Knowledge