Description: I run a play-based daycare. Singing, dancing, arts & crafts, laughing and having fun. Manners, social skills, empathy and humor are all things I try and teach the children in my care. Basic Schedule: 7:00am-8:30am Drop off/Free play 8:30am- Breakfast or morning snack/ Start the infants in a nap routine 9:00am-School structured activity/ Infants nap 10:00am Infants wake up/Go outside 10:00am-11:15am-Outside time/Free play 11:15am-12:30pm-Lunch/Structured play/Infants ready for afternoon nap 12:30pm-2:30pm-Nap time 2:30pm-3:00pm- Start waking everyone up and sitting down for afternoon snack 3:30pm-4:00pm Clean up from snack/get ready to go outside 4:00pm-5:00pm Free play 5:00-5:30 Clean up and get ready for parents Outside time is based off the weather
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable, but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns, as the provider may have already addressed some or all issues. Reports can also be verified with your local daycare licensing office.
Type | Create Date | Due Date | Corrected Date | Status |
---|---|---|---|---|
Violation | 2022-07-15 | 2022-08-01 | 2022-07-26 | Final |
Regulation/Restriction: 5.10.3.3: Safe Use Zones For all play equipment that is thirty (30) inches or higher from the ground, including climbing equipment, slides, swings and other similar equipment, the FCCP shall ensure that the surface under and around the equipment, included recommended use zones, is of approved resilient material that protects children if they fall. * Materials in the use zone shall consist of wood chips, pea stone, mulch, engineered wood fibers, sand, safety-tested shredded or rubber like material or rubber mats designed for protective cushioning; * Materials used in the use zone shall follow the recommendations listed in the most recent publication of U.S. Consumer Product Safety Commission's Public Playground Safety Handbook regarding critical depth of tested materials determined by the height of the highest climbing surface of the equipment; * Materials used in the use zone shall be installed and maintained according to the manufacturer's instructions; * If the loose material such as sand, mulch, or shredded rubber is used in use zones, the FCCP shall ensure that the material is raked regularly and replenished to maintain depth and resilience; and * If the resilient material in use zones freezes, the FCCP shall ensure that the children will not play on the equipment until the resilient material has thawed and is once again resilient. |
If you are a provider and you believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Be the first to review this childcare provider. Write a review about Belisle, Kaitlyn. Let other families know what’s great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.
Connect, Seek Advice, Share Knowledge