North Central Missouri College
Quick Facts
Missing details such as transportation or rates? Suggest an update to help other families.
Contact Information
📞 (660) 258-7035Reviews
Write a Review
Be the first to review this childcare provider. Write a review about North Central Missouri College. Let other families know what's great, or what could be improved. Please read our brief review guidelines to make your review as helpful as possible.
About the Provider
Hours of Operation
- Monday6:00 AM- 9:00 PM
- Tuesday6:00 AM- 9:00 PM
- Wednesday6:00 AM- 9:00 PM
- Thursday6:00 AM- 9:00 PM
- Friday6:00 AM- 9:00 PM
- Saturday Closed
- Sunday Closed
Inspection/Report History
Where possible, ChildcareCenter provides inspection reports as a service to families. This information is deemed reliable but is not guaranteed. We encourage families to contact the daycare provider directly with any questions or concerns. Reports can also be verified with your local daycare licensing office.
| Report Date | Report Type | Violations |
|---|---|---|
| 2026-05-20 | COMPLIANCE VERIFICATION | 2 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The fall-zone area under and around outdoor equipment where children might fall and be injured was not covered with impact-absorbing materials to cushion a fall as evidenced by no resilient material was present. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 5. states: The fall-zone area under and around outdoor equipment where children might fall and be injured shall be covered with impact absorbing materials which will effectively cushion the fall of a child. This material may include sand, pea gravel, tanbark, shredded tires, wood chips, rubber matting or other approved resilient material. Correction Required: The facility shall maintain approved resilient material in all fall-zone areas. Correction Verification: Submit Documentation Compliance Date: 5/18/2026 5 CSR 25-500.087 Fire Safety Violation: Requirements of 19 CSR 30-62.087 Fire Safety were not met as evidenced by the date of the drill was not recorded. Rule Reference: 5 CSR 25-500.087 Fire Safety (2) (F) states: Child care staff shall conduct at least one (1) fire drill each month and a disaster drill at least every three (3) months. The disaster drills shall include tornado drills. The provider shall maintain a written record at the facility of the date, type of drill, time required to evacuate the building, and number of children present during the drill. Correction Required: Fire, tornado, and other disaster drills shall be completed and recorded as required. Correction Verification: Corrected on Site Compliance Date: 5/20/2026 |
||
| 2026-05-05 | COMPLIANCE MONITORING | 2 violations cited |
|
Findings: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers Violation: The fall-zone area under and around outdoor equipment where children might fall and be injured was not covered with impact-absorbing materials to cushion a fall as evidenced by no resilient material was present. Rule Reference: 5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 5. states: The fall-zone area under and around outdoor equipment where children might fall and be injured shall be covered with impact absorbing materials which will effectively cushion the fall of a child. This material may include sand, pea gravel, tanbark, shredded tires, wood chips, rubber matting or other approved resilient material. Correction Required: The facility shall maintain approved resilient material in all fall-zone areas. Correction Verification: Submit Documentation 5 CSR 25-500.087 Fire Safety Violation: Requirements of 19 CSR 30-62.087 Fire Safety were not met as evidenced by the date of the drill was not recorded. Rule Reference: 5 CSR 25-500.087 Fire Safety (2) (F) states: Child care staff shall conduct at least one (1) fire drill each month and a disaster drill at least every three (3) months. The disaster drills shall include tornado drills. The provider shall maintain a written record at the facility of the date, type of drill, time required to evacuate the building, and number of children present during the drill. Correction Required: Fire, tornado, and other disaster drills shall be completed and recorded as required. Correction Verification: Submit Documentation |
||
| 2026-04-10 | COMPLAINT INVESTIGATION | |
| 2025-11-04 | COMPLIANCE MONITORING | No violations cited |
| 2025-05-13 | COMPLIANCE MONITORING | No violations cited |
| 2024-11-14 | COMPLIANCE MONITORING | No violations cited |
| 2024-05-02 | COMPLIANCE MONITORING | No violations cited |
| 2023-11-06 | COMPLIANCE MONITORING | No violations cited |
| 2023-05-04 | COMPLIANCE MONITORING | |
| 2023-02-02 | COMPLIANCE MONITORING | |
| 2022-11-04 | COMPLIANCE MONITORING | |
| 2022-07-13 | COMPLIANCE VERIFICATION | |
| 2022-05-06 | COMPLIANCE MONITORING | |
If you are a provider and believe any information is incorrect, please contact us. We will research your concern and make corrections accordingly.
Nearby Providers
Looking for Child Care?